![Ditch Witch JT5 Operator'S Manual Download Page 46](http://html1.mh-extra.com/html/ditch-witch/jt5/jt5_operators-manual_2510009046.webp)
Manual
Prepare - 45
Inspect Site
CMW
®
Select Start and End Points
Select one end to use as a starting point. Consider the following when selecting a starting point:
Slope
Fluid system should be parked on a level site. Consider how slope will affect drilling unit setup, bending
pipe, and fluid flow out of hole.
Traffic
Vehicle and pedestrian traffic must be a safe distance from drilling equipment. Allow at least 10’ (3 m)
buffer zone around equipment.
Space
Check that there is enough space to work and to set up electric strike system.
Comfort
Consider shade, wind, fumes, and other site features.
Drill downhill when possible so fluid will flow away from drilling unit.
Summary of Contents for JT5
Page 1: ...JT5 Issue 3 0 Original Instruction Operator s Manual CMW 053 2380...
Page 7: ...Overview 6 JT5 Operator s Manual CMW...
Page 21: ...Safety 20 JT5 Operator s Manual Machine Safety Alerts CMW...
Page 61: ...Drive 60 JT5 Operator s Manual Shut Down Unit CMW...
Page 85: ...Conduct a Bore 84 JT5 Operator s Manual Remove Pullback Device CMW...
Page 119: ...Complete the Job 118 JT5 Operator s Manual Stow Tools CMW...
Page 149: ...Specifications 148 JT5 Operator s Manual CMW...
Page 152: ......
Page 153: ......
Page 154: ...JT5 Operator s Manual Service Record 153 CMW Service Record Service Performed Date Hours...
Page 155: ...CMW Service Record 154 JT5 Operator s Manual Service Performed Date Hours...