
JT5 Operator’s Manual
Operation Overview - 39
Drilling
CMW
®
Drilling
1.
2.
Prime drilling fluid pump. See page 70.
3.
Engage DrillLok™/tracker control if desired. See page 101.
4.
Drill first pipe. See page 75.
5.
Record bore path. See page 78.
7.
Drill remaining pipes in pipe box and correct direction (page 74) as necessary.
8.
Surface drill head. See page 79.
Backreaming
1. Assemble backream string. See page 80.
2.
Start drilling unit and adjust throttle.
3.
Set drilling fluid flow. Check that fluid flows through all nozzles. See page 96.
4.
Remove pipe from bore. See page 82.
5.
Remove pullback device. See page 83.
Backreaming Tips
•
Plan backreaming job before drilling. Plan bore path as straight as possible. Check bend limits of
pullback material. Check that appropriate pullback devices are on hand.
•
Keep all bends as gradual as possible.
•
Drilling fluid quality is a key factor in backreaming success. Contact your Ditch Witch
®
dealer for
information on testing water, selecting additives, and mixing drilling fluid.
•
Backreaming requires more fluid than drilling. Make sure enough fluid is used.
Summary of Contents for JT5
Page 1: ...JT5 Issue 3 0 Original Instruction Operator s Manual CMW 053 2380...
Page 7: ...Overview 6 JT5 Operator s Manual CMW...
Page 21: ...Safety 20 JT5 Operator s Manual Machine Safety Alerts CMW...
Page 61: ...Drive 60 JT5 Operator s Manual Shut Down Unit CMW...
Page 85: ...Conduct a Bore 84 JT5 Operator s Manual Remove Pullback Device CMW...
Page 119: ...Complete the Job 118 JT5 Operator s Manual Stow Tools CMW...
Page 149: ...Specifications 148 JT5 Operator s Manual CMW...
Page 152: ......
Page 153: ......
Page 154: ...JT5 Operator s Manual Service Record 153 CMW Service Record Service Performed Date Hours...
Page 155: ...CMW Service Record 154 JT5 Operator s Manual Service Performed Date Hours...