
Manual
Prepare - 53
Plan Bore Path
CMW
®
Minimum Depth
Because you must bend pipe gradually, entry pitch and
bend limits determine how deep the pipe will be when
it becomes horizontal. This is called the
minimum
depth
.
•
To reduce minimum depth (D1), reduce entry
pitch. This also decreases setback.
•
To increase minimum depth (D2), increase entry
pitch. This also increases setback.
Bore Path Calculator
Entry pitch, setback, and minimum depth work together with bend limits to determine the bore path. To find
the setback (B) and entry pitch (A) that will take you to the desired minimum depth (D), use the chart
below.
Minimum depth (D)
Entry pitch (A)
Setback (B)
Depth to begin steering (S)
2’ 0" (0.6 m)
-18%
17’ 4" (5.3 m)
0’ 11" (0.28 m)
2’ 4" (0.7 m)
-20%
18’ 8" (5.7 m)
1’ 0" (0.30 m)
2’ 9" (0.8 m)
-22%
19’ 11" (6.1 m)
1’ 1" (0.33 m)
3’ 1" (0.9 m)
-24%
21’ 2" (6.5 m)
1’ 2" (0.36 m)
3’ 6" (1.1 m)
-26%
22’ 5" (6.8 m)
1’ 3" (0.38 m)
3’ 11" (1.2 m)
-28%
23’ 8" (7.2 m)
1’ 4" (0.41 m)
4’ 5" (1.4 m)
-30%
24’ 11" (7.6 m)
1’ 5" (0.43 m)
IMPORTANT:
Numbers in table based on
70’ (21.3 m) minimum bend radius
, beacon housing, EZ-
Connect, connector, transition sub, and 1/3 of first drill pipe (L, totaling 5’ [1.5 m]) in the ground before
steering.
Summary of Contents for JT5
Page 1: ...JT5 Issue 3 0 Original Instruction Operator s Manual CMW 053 2380...
Page 7: ...Overview 6 JT5 Operator s Manual CMW...
Page 21: ...Safety 20 JT5 Operator s Manual Machine Safety Alerts CMW...
Page 61: ...Drive 60 JT5 Operator s Manual Shut Down Unit CMW...
Page 85: ...Conduct a Bore 84 JT5 Operator s Manual Remove Pullback Device CMW...
Page 119: ...Complete the Job 118 JT5 Operator s Manual Stow Tools CMW...
Page 149: ...Specifications 148 JT5 Operator s Manual CMW...
Page 152: ......
Page 153: ......
Page 154: ...JT5 Operator s Manual Service Record 153 CMW Service Record Service Performed Date Hours...
Page 155: ...CMW Service Record 154 JT5 Operator s Manual Service Performed Date Hours...