![Ditch Witch JT40 Operator'S Manual Download Page 92](http://html.mh-extra.com/html/ditch-witch/jt40/jt40_operators-manual_2510008092.webp)
JT40/JT40 All Terrain Operator’s Manual
Prepare - 91
Plan Bore Path
Plan Bore Path
Plan the bore path, from entry to end, before drilling begins. Subsite
®
Electronics bore planning software is
available for planning your bore path. This special software can be run in the field using a laptop computer.
See your Ditch Witch
®
dealer for details.
If not using bore planning software, mark the bore path on the ground with spray paint or flags, or record it
on paper for operator reference.
For complicated bores
, consult an engineer. Have the jobsite surveyed and bore path calculated. Be sure
the engineer knows minimum entry pitch, bend limits of drill pipe, bend and tension limits of pullback
material, pipe lengths, and location of all underground utilities.
For less complicated bores
, plan the bore based on four measurements:
•
recommended bend limit
•
entry pitch
•
minimum setback
•
minimum depth
IMPORTANT:
See the following pages for more information about these measurements. If not using
bore planning software, see “Bore Path Calculator” on page 97 and use these measurements to help
plan your bore.
Summary of Contents for JT40
Page 1: ...JT40 JT40 All Terrain HRC and LRC Issue 1 0 Original Instruction Operator s Manual 053 2966 ...
Page 79: ...Controls 78 JT40 JT40 All Terrain Operator s Manual Battery Disconnect ...
Page 113: ...Drive 112 JT40 JT40 All Terrain Operator s Manual Shut Down Unit ...
Page 119: ...Transport 118 JT40 JT40 All Terrain Operator s Manual Retrieve ...
Page 147: ...Conduct a Bore 146 JT40 JT40 All Terrain Operator s Manual Remove Pullback Device ...
Page 199: ...Complete the Job 198 JT40 JT40 All Terrain Operator s Manual Stow Tools ...
Page 241: ...Service 240 JT40 JT40 All Terrain Operator s Manual As Needed ...
Page 250: ......
Page 251: ......
Page 253: ...Service Record 252 JT40 JT40 All Terrain Operator s Manual Service Performed Date Hours ...