![Ditch Witch JT40 Operator'S Manual Download Page 128](http://html.mh-extra.com/html/ditch-witch/jt40/jt40_operators-manual_2510008128.webp)
JT40/JT40 All Terrain Operator’s Manual
Conduct a Bore - 127
Assemble Drill String
Prepare Beacon Housing
1.
Select nozzles and bit.
2.
Insert nozzle into beacon housing.
3.
Attach bit to beacon housing.
4.
Install beacon, following beacon instructions for:
•
battery replacement
•
beacon positioning.
5.
Install beacon housing lid.
6.
Follow beacon instructions to check beacon operation.
7.
Follow tracker instructions to calibrate beacon.
Attach Transition Sub
1.
Remove blocks from pipe guides.
2.
Pull transition sub into front wrench.
3.
Close wrench.
4.
Lube joints.
5.
Use machine torque to tighten joint fully.
Attach Beacon Housing
Use machine torque to attach beacon housing.
1.
Pull beacon housing into front wrench.
2.
Close wrench.
3.
Use machine torque to tighten joint fully.
IMPORTANT:
A variety of nozzles and bits are available to suit your particular job conditions.
See page 163 for more information, or contact your Ditch Witch
®
dealer.
Summary of Contents for JT40
Page 1: ...JT40 JT40 All Terrain HRC and LRC Issue 1 0 Original Instruction Operator s Manual 053 2966 ...
Page 79: ...Controls 78 JT40 JT40 All Terrain Operator s Manual Battery Disconnect ...
Page 113: ...Drive 112 JT40 JT40 All Terrain Operator s Manual Shut Down Unit ...
Page 119: ...Transport 118 JT40 JT40 All Terrain Operator s Manual Retrieve ...
Page 147: ...Conduct a Bore 146 JT40 JT40 All Terrain Operator s Manual Remove Pullback Device ...
Page 199: ...Complete the Job 198 JT40 JT40 All Terrain Operator s Manual Stow Tools ...
Page 241: ...Service 240 JT40 JT40 All Terrain Operator s Manual As Needed ...
Page 250: ......
Page 251: ......
Page 253: ...Service Record 252 JT40 JT40 All Terrain Operator s Manual Service Performed Date Hours ...