![Ditch Witch JT40 Operator'S Manual Download Page 125](http://html.mh-extra.com/html/ditch-witch/jt40/jt40_operators-manual_2510008125.webp)
Conduct a Bore - 124
JT40/JT40 All Terrain Operator’s Manual
Clamp Pipe
Clamp Pipe
Clamp on pipe when joint is between wrenches
(1 and 2). Always clamp on the larger diameter
areas on either side of the tool joint face.
Turning shaft will kill you or crush arm or leg. Stay away.
To help avoid injury:
Only clamp pipe at reinforced end. Clamping
anywhere else on the pipe will weaken the pipe. Pipe can later break,
even when operating under normal loads.
NOTICE:
Ensure that any downhole tool or pipe in tool joint vises is attached to spindle or removed
before transport. Wrenches can open after engine shutdown.
NOTICE:
Clamping pipes on top of female
end threads can damage threads. Only clamp
female pipe ends behind the threads.
Summary of Contents for JT40
Page 1: ...JT40 JT40 All Terrain HRC and LRC Issue 1 0 Original Instruction Operator s Manual 053 2966 ...
Page 79: ...Controls 78 JT40 JT40 All Terrain Operator s Manual Battery Disconnect ...
Page 113: ...Drive 112 JT40 JT40 All Terrain Operator s Manual Shut Down Unit ...
Page 119: ...Transport 118 JT40 JT40 All Terrain Operator s Manual Retrieve ...
Page 147: ...Conduct a Bore 146 JT40 JT40 All Terrain Operator s Manual Remove Pullback Device ...
Page 199: ...Complete the Job 198 JT40 JT40 All Terrain Operator s Manual Stow Tools ...
Page 241: ...Service 240 JT40 JT40 All Terrain Operator s Manual As Needed ...
Page 250: ......
Page 251: ......
Page 253: ...Service Record 252 JT40 JT40 All Terrain Operator s Manual Service Performed Date Hours ...