![Ditch Witch JT40 Operator'S Manual Download Page 195](http://html.mh-extra.com/html/ditch-witch/jt40/jt40_operators-manual_2510008195.webp)
Complete the Job - 194
JT40/JT40 All Terrain Operator’s Manual
Antifreeze Drilling Unit
Antifreeze Drilling Unit
Your drilling unit can be left overnight in freezing conditions by filling fluid lines with a polyproplyene-based
antifreeze (p/n 265-1055) with optional antifreeze system before shutdown.
Add Antifreeze
1.
Fill antifreeze tank with 8 gal (30 L) of approved antifreeze.
2.
Install plug on suction side of drilling fluid pump.
3.
Open valve below antifreeze tank.
4.
Install optional antifreeze reclaimer
adapter in spindle. Ensure valve (shown) is
open.
5.
Turn drilling fluid potentiometer
counterclockwise to zero position.
6.
Start unit and set throttle to slow position.
7.
Set drilling fluid pump switch to on position.
8.
Slowly turn drilling fluid potentiometer
clockwise until indicator light comes on. If
light does not come on, press drilling fluid
pump switch.
9.
Run drilling fluid pump until antifreeze
comes out of spindle.
10. Turn drilling fluid pump switch to off
position. Close valve on antifreeze
reclaimer adapter.
j59om104w.eps
Summary of Contents for JT40
Page 1: ...JT40 JT40 All Terrain HRC and LRC Issue 1 0 Original Instruction Operator s Manual 053 2966 ...
Page 79: ...Controls 78 JT40 JT40 All Terrain Operator s Manual Battery Disconnect ...
Page 113: ...Drive 112 JT40 JT40 All Terrain Operator s Manual Shut Down Unit ...
Page 119: ...Transport 118 JT40 JT40 All Terrain Operator s Manual Retrieve ...
Page 147: ...Conduct a Bore 146 JT40 JT40 All Terrain Operator s Manual Remove Pullback Device ...
Page 199: ...Complete the Job 198 JT40 JT40 All Terrain Operator s Manual Stow Tools ...
Page 241: ...Service 240 JT40 JT40 All Terrain Operator s Manual As Needed ...
Page 250: ......
Page 251: ......
Page 253: ...Service Record 252 JT40 JT40 All Terrain Operator s Manual Service Performed Date Hours ...