![Ditch Witch JT40 Operator'S Manual Download Page 174](http://html.mh-extra.com/html/ditch-witch/jt40/jt40_operators-manual_2510008174.webp)
JT40/JT40 All Terrain Operator’s Manual
Systems and Equipment - 173
Drill Pipe
Use Drill Pipe Correctly
Align the Joints
Always carefully align the male and female
ends of pipe before threading them together.
Poor alignment can damage the threads and
destroy the usefulness of the joint.
Clamp Pipe Correctly
Clamp on pipe when joint is between
wrenches. Clamp only on the tool joint of the
drill pipe as shown. This portion of the drill
pipe is designed for clamping and is
considerably thicker and stronger than the
rest of the pipe.
See “Clamp Pipe” on page 124 for more
information.
NOTICE:
If joints get out of alignment
during a bore, use frame tilt or rear
stabilizers to adjust the unit.
NOTICE:
Clamping anywhere else on the
pipe will weaken the pipe. Pipe can later
break, even when operating under normal
loads.
Summary of Contents for JT40
Page 1: ...JT40 JT40 All Terrain HRC and LRC Issue 1 0 Original Instruction Operator s Manual 053 2966 ...
Page 79: ...Controls 78 JT40 JT40 All Terrain Operator s Manual Battery Disconnect ...
Page 113: ...Drive 112 JT40 JT40 All Terrain Operator s Manual Shut Down Unit ...
Page 119: ...Transport 118 JT40 JT40 All Terrain Operator s Manual Retrieve ...
Page 147: ...Conduct a Bore 146 JT40 JT40 All Terrain Operator s Manual Remove Pullback Device ...
Page 199: ...Complete the Job 198 JT40 JT40 All Terrain Operator s Manual Stow Tools ...
Page 241: ...Service 240 JT40 JT40 All Terrain Operator s Manual As Needed ...
Page 250: ......
Page 251: ......
Page 253: ...Service Record 252 JT40 JT40 All Terrain Operator s Manual Service Performed Date Hours ...