![Ditch Witch JT40 Operator'S Manual Download Page 180](http://html.mh-extra.com/html/ditch-witch/jt40/jt40_operators-manual_2510008180.webp)
JT40/JT40 All Terrain Operator’s Manual
Systems and Equipment - 179
Pipeloader
Add/Remove Single Pipe
Load a single drill pipe or up to a whole row of drill pipe into last row of pipe box to finish bore without
changing pipe boxes. Pipe can be added as soon as last row of pipe has been started and other rows are
empty.
L
Electric shock will cause death or serious injury. Stay
away.
274-049
To help avoid injury:
•
Do not attempt to load and unload pipe while drilling or backreaming. Unprotected worker can be
injured by electric strike.
•
On electrical jobsite, load and unload pipe only if loader is wearing electrically insulating boots and
gloves.
Read operator’s manual. Know how to use all controls.
Your safety is at stake.
273-475
To help avoid injury:
•
Open or close
both
auxiliary pipe loaders. Moving shuttles with one auxiliary pipe loader open and
one closed will damage equipment and cause possible injury.
•
Carriage must be in full back position to load and unload pipe.
•
Drill pipe is heavy. Have enough people on hand to manually add or remove single pipe to pipe box.
Summary of Contents for JT40
Page 1: ...JT40 JT40 All Terrain HRC and LRC Issue 1 0 Original Instruction Operator s Manual 053 2966 ...
Page 79: ...Controls 78 JT40 JT40 All Terrain Operator s Manual Battery Disconnect ...
Page 113: ...Drive 112 JT40 JT40 All Terrain Operator s Manual Shut Down Unit ...
Page 119: ...Transport 118 JT40 JT40 All Terrain Operator s Manual Retrieve ...
Page 147: ...Conduct a Bore 146 JT40 JT40 All Terrain Operator s Manual Remove Pullback Device ...
Page 199: ...Complete the Job 198 JT40 JT40 All Terrain Operator s Manual Stow Tools ...
Page 241: ...Service 240 JT40 JT40 All Terrain Operator s Manual As Needed ...
Page 250: ......
Page 251: ......
Page 253: ...Service Record 252 JT40 JT40 All Terrain Operator s Manual Service Performed Date Hours ...