JT40/JT40 All Terrain Operator’s Manual
Prepare - 99
Plan Bore Path
AT40 Pipe
Minimum depth (D)
Entry pitch (A)
Setback (B)
Depth to begin steering (S)
4’ 3” (1.30 m)
18% / 10.0°
38’ 7” (11.76 m)
1’ 8” (0.51 m)
5’ 4” (1.63 m)
21% / 11.6°
43’ 3” (13.18 m)
1’ 11” (0.58 m)
6’ 8” (2.03 m)
23% / 13.2°
47’ 10” (14.58 m)
2’ 2” (0.66 m)
7’ 11”(2.41 m)
26% / 14.8°
52’ 4” (15.95 m)
2’ 5” (0.74 m)
9’ 7” (2.92 m)
29% / 16.4°
56’ 10” (17.32 m)
2’ 8” (0.81 m)
11’ 2” (3.40 m)
32% / 18.0°
61’ 4” (18.69 m)
2’ 11” (0.89 m)
IMPORTANT:
Numbers in table based on
170’ (51.8 m) minimum bend radius
and beacon housing
and 1/3 of first drill pipe (L, totaling 9’ 2” [2.79 m]) in the ground before steering.
Summary of Contents for JT40
Page 1: ...JT40 JT40 All Terrain HRC and LRC Issue 1 0 Original Instruction Operator s Manual 053 2966 ...
Page 79: ...Controls 78 JT40 JT40 All Terrain Operator s Manual Battery Disconnect ...
Page 113: ...Drive 112 JT40 JT40 All Terrain Operator s Manual Shut Down Unit ...
Page 119: ...Transport 118 JT40 JT40 All Terrain Operator s Manual Retrieve ...
Page 147: ...Conduct a Bore 146 JT40 JT40 All Terrain Operator s Manual Remove Pullback Device ...
Page 199: ...Complete the Job 198 JT40 JT40 All Terrain Operator s Manual Stow Tools ...
Page 241: ...Service 240 JT40 JT40 All Terrain Operator s Manual As Needed ...
Page 250: ......
Page 251: ......
Page 253: ...Service Record 252 JT40 JT40 All Terrain Operator s Manual Service Performed Date Hours ...