11
1-800-245-9917
Optional Handrail Installation
Unpacking
Remove the Handrail and Hardware Pack
from the shipping carton, and then remove
all plastic wrapping. Check for any damage
that may have taken place during shipment.
Keep and use the original carton and
packing material for return shipment if it
should become necessary. The purchaser
is responsible for filing all claims for any
damages or loss incurred during transit.
You should have the following components:
(1) Handrail
(1) Hardware Pack, containing:
(8) M5 x 25 Machine Screws
(8) M5 Nuts
Installation
1. Referring to Figure No. 1, remove the handrail covers, (one on each side of the column) from the
scale platform.
Figure No. 1
(Handrail Installation, Step 1)
Summary of Contents for Attendant SOLO-DS
Page 13: ......