Page 24
Expansion
vessel size
Pre-charge
LA 16 MI
10L
1 bar
LA 12 M
LA 9 MI
6L
LA 6 MI
Table 13: Size of expansion vessel in the LA MI range
For most installations the 10L expansion vessel should
be able suitable with a volume up to 200L and a static
height of 7m. The 5L expansion vessel should be
suitable for a system volume up to 100L and a static
height of 7m.
2 port valves
The heat pump packages include 2 x F228 Horstmann
two port valves as shown in Figure 18 to switch
between space heating and domestic hot water mode.
Fit the valves ensuring that the actuator head is not
below the horizontal level of the pipe work and that the
flow is in the direction of the arrow. Remember to
make allowances for maintenance and replacement.
Figure 18: Dimensions of F228 valve
Controlling DHW temperature
The cylinder temperature is controlled via an NTC2
sensor.
For safety reasons the heat pump controller also
checks for continuity from the DHW thermostat. The
temperature regulation thermostat and high limit stat
are wired in series. To keep the contacts closed on the
regulation stat the dial must be set to maximum. The
contacts on the high limit stat will remain closed during
normal operation. If the heat pump does not detect
continuity across both the regulation stat and high limit
stat an H91 error will occur.
A label similar to that shown in Figure 6 should be
supplied by the installer and fixed on the cylinder to let
the user know.
Figure 19: Notice to be supplied by the installer and fixed
next to cylinder thermostat
TEMPERTURE ADJUSTMENT
The temperature of the hot water in this
cylinder is set using the wall mounted heat
pump controller. The setting shown on this
thermostat does not affect the hot water
temperature.
For normal operation the dial should be
set to the maximum position.
The thermostat on the cylinder should
not be modified to disable the regulation
stat or high limit stat.
The F228 valves have been specifically
selected for their fast operating times. When
switching from heating to DHW the heat
pump flow must not be restricted. If a
different valve is used, the valve must be
fully open within 6 seconds of being
switched.
Summary of Contents for LA 12 MI
Page 35: ...Page 34 Package 1 and 2 Plumbing Schematic...
Page 36: ......
Page 40: ...Page 39 CE declaration of conformity...
Page 41: ...Page 40 LA 6 MI performance...
Page 42: ...Page 41 LA 6 MI continued...
Page 43: ...Page 42 LA 9 MI performance...
Page 44: ...Page 43 LA 9 MI performance continued...
Page 45: ...Page 44 LA 12 MI performance...
Page 46: ...Page 45 LA 12 MI performance continued...
Page 47: ...Page 46 LA 16 MI performance...
Page 48: ...Page 47 LA 16 MI performance continued...
Page 49: ...Page 48 Product Dimensions LA 6 MI and LA 9 MI...
Page 50: ...Page 49 Product Dimensions LA 12 MI and LA 16 MI...
Page 61: ...Page 60 Information for DHW cylinder with buffer ECS125HP 580...
Page 62: ...Page 61 Information for DHW cylinder with buffer ECS150HP 75 580...
Page 63: ...Page 62 Information for DHW cylinder with buffer ECS210HP 75 580...