
48
•
Loosen the Pivot Pin retaining Set Screw in the Operating Handle (13718) with an Allen Wrench, slide the Pivot
Pin (13622) out of the Mainshaft. Clean, apply grease and reinstall.
•
With the Mainshaft out of the Frame, carefully pry the white plastic spent Primer Track Cover from the right
side of the Square Deal Mainshaft and clean the primer and powder reside out of the Track. Reinstall the Track
Cover.
Remove Clean and
Grease Pivot Pin
Used Primer
Track Cover
Clean out Primer
Track Cover and
replace Cover
Summary of Contents for Square Deal B
Page 50: ...50 13 DILLON PRECISION Square Deal B EXPLODED VIEWS AND PARTS IDENTIFIER 13 1 Main Assembly ...
Page 51: ...51 13 2 Frame and Lower Assembly Index Assembly Index Assembly installed in Frame Index Pawl ...
Page 52: ...52 13 3 Typical Toolhead Assembly 45ACP Shown ...
Page 53: ...53 13 4 Automatic Primer Assembly ...
Page 55: ...55 13 6 Primer Early Warning System ...