
34
9.3.
Die Caliber Conversion Procedure
Remove the Powder Measure by removing the Spring Clip from the Fail-Safe Rod and disconnecting the
Rod from the Powder Measure. Put the Spring Clip back in the Rod-end for safekeeping.
Remove the Powder Measure Clamp Screw, Clamp and lift the Powder Measure up and off the Powder Die.
Empty the Powder in the Powder Measure into the original container cycling the Powder Measure right side
up and upside down.
Remove all four of the 10-24 Socket Head Toolhead Mounting Screws and remove the complete Toolhead
Assembly exposing the Dies.
Remove the Spring Clip and
disconnect the Failsafe Rod from
the Lock-link Assembly
Store the Spring Clip in the
Failsafe Rod
Remove the Powder
Measure Clamp
Remove all four Toolhead attachment
screws with a 5/32” Allen wrench
Remove the Toolhead
Assembly exposing the dies
Slide the Powder Measure up off
the Powder Die
Summary of Contents for Square Deal B
Page 50: ...50 13 DILLON PRECISION Square Deal B EXPLODED VIEWS AND PARTS IDENTIFIER 13 1 Main Assembly ...
Page 51: ...51 13 2 Frame and Lower Assembly Index Assembly Index Assembly installed in Frame Index Pawl ...
Page 52: ...52 13 3 Typical Toolhead Assembly 45ACP Shown ...
Page 53: ...53 13 4 Automatic Primer Assembly ...
Page 55: ...55 13 6 Primer Early Warning System ...