
40
9.6.
To Replacing The Battery In The Primer Early Warning System.
•
Slide the Black Cover down and replace the AAA battery inside and slide the Black Sliding Cover back up into
position.
10.
ADJUSTMENT PROCEDURES
10.1.
Shellplate to Primer Feed/Toolhead Alignment and Indexing
•
CAUTION! The Base Disc (13690) and the two Base Disc Mounting Screws (13860 shown below) are factory
aligned and should not require service nor should be loosened or removed from the Square Deal Frame.
Doing so may require that the Square Deal be returned to Dillon for re-alignment.
•
Before doing any adjustments to the Indexing or Priming System, verify that the Shellplate bolt 13328 above, is
securely tight and the Primer Slide is assembled correctly and to the proper height as shown below:
DO NOT LOOSEN
OR REMOVE
Index Limit
Setscrew
Shellplate Bolt
•
Slide cover down
•
Replace the AAA
Battery
•
Slide cover back up
Summary of Contents for Square Deal B
Page 50: ...50 13 DILLON PRECISION Square Deal B EXPLODED VIEWS AND PARTS IDENTIFIER 13 1 Main Assembly ...
Page 51: ...51 13 2 Frame and Lower Assembly Index Assembly Index Assembly installed in Frame Index Pawl ...
Page 52: ...52 13 3 Typical Toolhead Assembly 45ACP Shown ...
Page 53: ...53 13 4 Automatic Primer Assembly ...
Page 55: ...55 13 6 Primer Early Warning System ...