39
Slide the replacement Powder Bar into the Powder Body by pushing out on the Drive Pin and White Cube
with your finger to engage the drive slot in the Powder Bar.
Verify that the Powder Funnel is still inside the Powder Die and Slide the Powder Measure down over the
Powder Die and tighten the Clamp. Re-connect the Failsafe Rod and Spring Clip.
9.5.
Replacing the Depriming pin in the Depriming Assembly
The Depriming Pin can be broken by foreign objects inside the case such as rocks, smaller cases or Berdan
cases. The Pin is easy to replace.
Remove the Deprime Assembly from the Toolhead. Hold the 9/16” hex with a Square Deal Bench wrench
or a 9/16” wrench and unscrew the Knurled Nut holding the Priming Pin in place with a pair of pliers or
Vice Grips. Replace the Pin (spares available from Dillon) or use the spare in the Conversion Kit Box and
retighten the Knurled N with the pliers.
Re-tighten the Pivot SHCS and the Self-
Locking Nut—do not over tighten—
check that the Lock Link Assembly
moves freely back and forth
Push out on the Drive Pin and “Cube”
while pushing the Powder Bar into the
Powder Measure to engage the Powder
Bar Drive Slot
Gently slide the
Powder Measure
down over the
Powder Die and
secure it with the
Powder Measure
Clamp and Screw
Re-install the
Failsafe Rod and
the Spring Clip
Depriming Assembly
Use the Square Deal Bench Wrench or 9/16”
end
wrench and a pair of pliers to unscrew
the Nut retaining the
Depriming Pin
Replace the Depriming Pin and
retighten the Knurled Nut
Nut for
.32 ACP
Summary of Contents for Square Deal B
Page 50: ...50 13 DILLON PRECISION Square Deal B EXPLODED VIEWS AND PARTS IDENTIFIER 13 1 Main Assembly ...
Page 51: ...51 13 2 Frame and Lower Assembly Index Assembly Index Assembly installed in Frame Index Pawl ...
Page 52: ...52 13 3 Typical Toolhead Assembly 45ACP Shown ...
Page 53: ...53 13 4 Automatic Primer Assembly ...
Page 55: ...55 13 6 Primer Early Warning System ...