GP-377 Series User Guide
1-1
Be sure to follow these steps when creating projects for the GP unit.
1 Preparation
Before using the GP, check that all required hardware is
present and read all specification, wiring, and installa
tion information.
Chapter2, "Specifications"
, and Chapter
3, "Installation and Wiring"
2 Screen Design
Create a sample screen and design a Tag layout, with
the Screen layout sheets and Tag lists provided in the
Editor software.
GP-PRO/PBIII for Windows Operation
Manual (included with the screen creation software)
3 Select GP and
Using the input areas provided, select the GP and the
PLC types
PLC types to be used.
GP-PRO/PBIII for Windows Operation
Manual (included with the screen creation software)
4 Create Screen/ Run
Setup the screen and tags in your screen editing
Screen Setup
software according to your Screen Design.
GP-PRO/PBIII for Windows Operation
Manual and Tag Reference Manual (included with the
screen creation software)
5 Transfer Screen Data
Transfer the data from the Screen design software on
your PC to the GP unit using the Downloading Cable.
GP-PRO/PBIII for Windows Operation
Manual (included with the screen creation software)
6 GP/Host Connection
Set up the GP so that it can receive data from the Host
(PLC).
Chapter 4-3, "Initialize", and
PLC
Connection Manual
7 Connect the GP
Link the GP with the host (PLC) using the appropriate
connection cable (different cables may be necessary for
different hosts), and then run the unit.
GP-PRO/PBIII for Windows PLC Con-
nection Manual (included with the screen creation software)
1.1
Prior to Operating the GP
Chapter
1 Introduction
1. Prior to Operating the GP
2. System Design
3. Accesories
Summary of Contents for GP-377 Series
Page 14: ...xiv GP 377 Series User Guide Preface Memo ...
Page 22: ...Memo ...
Page 32: ...Memo ...
Page 48: ...Memo ...
Page 72: ...GP 377 Series Users Manual 5 24 Memo ...
Page 98: ...Memo ...