ADCS-601™ OPERATION AND MAINTENANCE MANUAL
© 2005 DH Instruments, Inc.
Page IV
6.11
CONTROL CABINET, INTERRUPTING PRESSURE SUPPLY TO THE TEST GAS SUPPLY PORT133
6.12
CONTROL CABINET, DRAIN DRIVE AIR TRAPS .............................................................................. 133
6.13
CONTROL CABINET, CHECK GAS SUPPLY PANEL SETTINGS.....................................................133
7 .
M A I N T E N A N C E O F T R A C E A B I L I T Y A N D R E C A L I B R A T I O N . . . 1 3 5
7.1
PRINCIPLES OF ADCS-601 TRACEABILITY MAINTENANCE.......................................................... 135
7.2
LOCAL METROLOGY MAINTENANCE BETWEEN RECALIBRATIONS .......................................... 135
7.2.1
OVERVIEW ................................................................................................................................................135
7.2.2
FPG8601, ZERO AND ADJUST SPAN OF LOAD CELL ..........................................................................136
7.2.2.1
AUTOMATICALLY INITIATED LOAD CELL ZERO AND SPAN ADJUSTMENT...................................136
7.2.2.2
OPERATOR INITIATED LOAD CELL ZERO AND SPAN ADJUSTMENT ............................................137
7.2.3
FPG8601, VALIDATE WITH PG7601 ........................................................................................................137
7.2.3.1
OVERVIEW ............................................................................................................................................137
7.2.3.2
RUNNING VALIDATION ........................................................................................................................138
7.2.3.3
VIEWING FPG VALIDATION DATA ......................................................................................................141
7.2.4
FPG8601, CHECK ON-BOARD P, T, H MEASUREMENTS .....................................................................141
7.2.5
FPG8601, VALIDATE LOAD CELL LINEARITY .......................................................................................141
7.2.5.1
OVERVIEW ............................................................................................................................................141
7.2.5.2
LINEARITY VERIFICATION PROCEDURE...........................................................................................142
7.2.5.3
EVALUATING LINEARITY VERIFICATION DATA ................................................................................142
7.2.6
FPG8601 AND PG7601, ZERO REFERENCE VACUUM CDGS ..............................................................143
7.2.7
PG7601, ADJUST ON-BOARD P, T, H SENSORS...................................................................................146
7.3
RECALIBRATION ................................................................................................................................ 147
7.3.1
OVERVIEW ................................................................................................................................................147
7.3.2
PG7601, CALIBRATION OF PISTON-CYLINDER MODULE ...................................................................148
7.3.2.1
PREPARING FOR CALIBRATION.........................................................................................................148
7.3.2.2
UPDATING PISTON-CYLINDER CALIBRATION INFORMATION ........................................................148
7.3.3
PG7601, CALIBRATION OF MASS SET...................................................................................................149
7.3.3.1
PREPARING FOR CALIBRATION.........................................................................................................149
7.3.3.2
UPDATING MASS SET CALIBRATION INFORMATION ......................................................................150
7.3.4
PG7601, CALIBRATION OF PISTON-CYLINDER MODULE TEMPERATURE SENSOR .......................151
7.3.4.1
OVERVIEW ............................................................................................................................................151
7.3.4.2
PROCEDURE ........................................................................................................................................152
7.3.4.3
CALCULATING AND UPDATING PISTON-CYLINDER TEMPERATURE SENSOR INFORMATION..152
7.3.5
PG7601, CALIBRATION OF REFERENCE VACUUM CDG .....................................................................154
7.3.5.1
OVERVIEW ............................................................................................................................................154
7.3.5.2
REMOVING THE CDG ASSEMBLY ......................................................................................................154
8 .
T R O U B L E S H O O T I N G . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 5 7
8.1
OVERVIEW .......................................................................................................................................... 157
9 .
A P P E N D I X . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 5 9
9.1
CONVERSION OF NUMERICAL VALUES ..........................................................................................159
9.1.1
PRESSURE................................................................................................................................................159
9.2
GLOSSARY.......................................................................................................................................... 160
9.3
WARRANTY STATEMENT .................................................................................................................. 161
Summary of Contents for ADCS-601
Page 10: ...ADCS 601 OPERATION AND MAINTENANCE MANUAL 2005 DH Instruments Inc Page VIII N NO OT TE ES S ...
Page 12: ...ADCS 601 OPERATION AND MAINTENANCE MANUAL 2005 DH Instruments Inc Page X N NO OT TE ES S ...
Page 19: ...2 SYSTEM OVERVIEW Page 7 2005 DH Instruments Inc Figure 2 ADCS 601 system pneumatic schematic ...
Page 114: ...ADCS 601 OPERATION AND MAINTENANCE MANUAL 2005 DH Instruments Inc Page 102 N NO OT TE ES S ...
Page 116: ...ADCS 601 OPERATION AND MAINTENANCE MANUAL 2005 DH Instruments Inc Page 104 N NO OT TE ES S ...
Page 146: ...ADCS 601 OPERATION AND MAINTENANCE MANUAL 2005 DH Instruments Inc Page 134 N NO OT TE ES S ...
Page 168: ...ADCS 601 OPERATION AND MAINTENANCE MANUAL 2005 DH Instruments Inc Page 156 N NO OT TE ES S ...
Page 174: ...ADCS 601 OPERATION AND MAINTENANCE MANUAL 2005 DH Instruments Inc Page 162 N NO OT TE ES S ...