4. OPERATION
Page 93
© 2005 DH Instruments, Inc.
Select the DUT with
<Label>
<King 3682>
and
<Output Label>
<Ps>
or
<Pt>
as desired. Press
[Next].
Enter the serial number of the DUT and other identifying information in the
fields provided at the top of the display. Do not change to
<IEEE Address>
Also verify that the range is correct, then press
[Next]
.
Select the
<King 3682 Ps Validation>
or
<King 3682 Pt Validation>
test
from the list and press
[Finish]
. There are no further initialization steps. The
test will complete initialization and start to run. The status bar updates
during initialization to display the current system operation.
Summary of Contents for ADCS-601
Page 10: ...ADCS 601 OPERATION AND MAINTENANCE MANUAL 2005 DH Instruments Inc Page VIII N NO OT TE ES S ...
Page 12: ...ADCS 601 OPERATION AND MAINTENANCE MANUAL 2005 DH Instruments Inc Page X N NO OT TE ES S ...
Page 19: ...2 SYSTEM OVERVIEW Page 7 2005 DH Instruments Inc Figure 2 ADCS 601 system pneumatic schematic ...
Page 114: ...ADCS 601 OPERATION AND MAINTENANCE MANUAL 2005 DH Instruments Inc Page 102 N NO OT TE ES S ...
Page 116: ...ADCS 601 OPERATION AND MAINTENANCE MANUAL 2005 DH Instruments Inc Page 104 N NO OT TE ES S ...
Page 146: ...ADCS 601 OPERATION AND MAINTENANCE MANUAL 2005 DH Instruments Inc Page 134 N NO OT TE ES S ...
Page 168: ...ADCS 601 OPERATION AND MAINTENANCE MANUAL 2005 DH Instruments Inc Page 156 N NO OT TE ES S ...
Page 174: ...ADCS 601 OPERATION AND MAINTENANCE MANUAL 2005 DH Instruments Inc Page 162 N NO OT TE ES S ...