
Pictures for illustrati ng pur poses o nly
49
E
LECTRO
V
AP
RTH-V2
Setting up
2
1
Before putting your humidifier in operation,
please make sure that your installation be
in conformity w ith the manufacturer’s
technical specifications.
•
Open the water valve of the main water line.
•
Switch on the main power supply contactors (voltage
and command).
•
The power-on light
must be illuminated .
•
Switch on I the I/O (on/off) rocker switch.
•
The display will default to show the rate of steam
produced. You are in the user information menu.
DISPLAY OPERATION :
1 Pressing the select button repeatedly will rotate
between the three main pages.
2 Enter the derised menu by pressing the up or
down button.
•
As soon as the humidifier is prompted by the
regulator, the humidity sensor or the humidistat, the
contactor of the DIN rail turns on and the power
heating is
on (the steam production LED is
illuminated)
•
When the unit is switched on, the inlet valve opens
and the boiler/s is/are flushed with water. The heating
elements then heat the water up and after about 10
minutes (the heating time depends on the model of
humidifier and the water conductivity), the humidifier
steams up.
Humidifier identification label stuck under and shielded by
the front panel polycarbonate label.
This
identification
label
provides
the
following
information : RTH model, unit serial number, command
voltage, power voltage, number of power phases,
intensity and electrical power.
1
2