1. Getting acquainted with your Water Blaster
MERMAID E1100-I
STD00
Page 11 of 54
Machine Installation / setup
Step 1.
Make sure that the machine is operating on flat floor or inclined not more than
10Deg.
The machine must be parked or securely tighten to structure.
Step 2.
Mount the M24 high-pressure hose (WP1100Bar)
onto the outlet fitting of the high pressure pump by screwing
the swivel on to the M24 high-pressure fitting to the HP
water Outlet.
Step 3
. Next, mount the trigger gun (Dump Gun) to the other
end of the M24 high-pressure hose. Always use two
wrenches when tightening the hoses.
Step 4.
Prepare the water supply, by attaching water hose to the
supplied low pressure inlet male-coupling
Step 5.
Turn on the water supply tap and fill the water tank with water. When water tank is
full, the water will be cut off.
Step 6.
Connect the main power cord to a grounded 3-phase main power supply.
¾” Inlet Water Hose Hose
Summary of Contents for MERMAID E1100-I
Page 38: ...4 Spare parts list MERMAID E1100 I STD00 Page 37 of 54 Pump assembly ...
Page 46: ...4 Spare parts list MERMAID E1100 I STD00 Page 45 of 54 ...
Page 47: ...4 Spare parts list MERMAID E1100 I STD00 Page 46 of 54 ...
Page 53: ...5 Wiring Diagram MERMAID E1100 I STD00 Page 52 of 54 5 Wiring Diagram ...