2-6
2-3 Cabinet Installation
SVG300AXXA-11/SVG500AXXA-11
;
Before beginning installation, please check the appearance of the model and confirm there is no
visible damage. Please follow the installation instructions in the manual to ensure the safety of
both the product and personnel.
;
When taking out the cabinet from the carton, please note whether the base-fixing iron plates
(L-shaped iron plates) need to be used in conjunction. If the base-fixing iron plates are not
needed, they can be left on the carton's base when taken out (as shown in figure 1-8(b)).
;
When installing the cabinet, make sure it is installed in a place that is well ventilated and
dust-free. Do not let any fiber, paper scraps, sawdust, metal scraps, or other foreign objects
enter the Static VAR Generator or become attached to the cooling fans, as this will cause the
Static VAR Generator to not operate properly.
;
When installing the cabinet, the cooling distances are shown in figures 2-1a &2-1b.
1.
Head space: To ensure that the model achieves an Ingress Protection rating of IP54, the
shortest distance for the space reserved for the replacement of the fans must be
at least 400mm (15.75 inches).
2.
Back space: If the user's installation requires wires coming in from the top, enough space
must be reserved behind the cabinet for the power cable to come in. The
shortest distance must be at least 200mm (7.87 inches).
3.
Side space: The cabinet door opens from left to right, therefore the side of the cabinet
cannot be placed directly against a wall; some space must be left on the side
for the doors to open. The shortest distance from the side to the wall must be at
least 275mm (10.83 inches), and the door must be able to open to at least
120°.
SVG300&SVG500
Top s pac e
≥
400mm
(15.75")
Bac k s pac e
≥
200mm
(7.87")
IP54
IP21/IP54
Figure 2-1a
Summary of Contents for SVG300A43A-11
Page 1: ...6...
Page 3: ...II NOTE 90 10 45 SVG300AXXA XX 10 40 SVG500AXXA XX CT K S1 L S2 CT CT CT SVG SVG...
Page 6: ...1 2 1 2 90 1 3 SVG SVG SVG300A43A 11 1 10...
Page 7: ...1 3 2 EPE 4 1 5 1 6 2 1 5 1 6 3 1 7 a M5 12 1 7 b M5 8 4 1 8 a b 1 3 3 1 8 a L...
Page 8: ...1 4 1 8 b 5 2 3 1 7 a 1 7 b 1 8 a 1 8 b...
Page 11: ...2 2 2 1 2 SVG300AXXA XX SVG500AXXA XX a b c d a 1 3 3 b 04 c 2 2 1 d...
Page 17: ...2 8 2 5 SVG300 mm inch...
Page 20: ...2 11 2 7...
Page 21: ...2 12 55mm 2 16in 63 6mm 2 50in 63 6mm 2 50in 100mm 3 94in 2 8...
Page 31: ...3 2...
Page 41: ...4 1 04 15 15 800 600 TFT LCD 100 SD 10 10 4 3 1 4 1 4 1 1 4 1 2 1 2 3 1 2 3 2...
Page 42: ...4 2 APFXXXA43X XX A Hz 1 4 3 or ON OFF 2 3 4 2 4 2 1 4 2 2 4 2 2 1 4 3...
Page 44: ...4 4 4 2 2 7 HELP HELP CT 6...
Page 45: ...4 5 CT 4 2 3 4 1 2...
Page 46: ...4 6 4 3 4 3 1 CT 20120123 1 2 3 CT CT CT CT P1 P2 P2 P1 CT CT CT...
Page 47: ...4 7 4 5 4 3 2 1 2 1 5 30 60 3 USB or SD Card...
Page 48: ...4 8 4 3 3 1 2 1 5 0 1 4 4 3 4 20120123 1 20120123 10 2...
Page 50: ...4 10 4 20120123 5 Save Quit X 10 10 120...
Page 51: ...4 11 6 03 4 3 5 20120123...
Page 52: ...4 12 1 20120123 2 20120123 3 20120123...
Page 53: ...4 13 4 5 4 3 6...
Page 54: ...4 14 1 200 2 20120123 3 20120123...
Page 55: ...4 15 4 20120123 5...
Page 56: ...5 1 5 5 1 SVG 4 3 5 200 1 2 10 R S T CT...
Page 57: ...5 2 IGBT CT RESET...
Page 58: ...5 3 RESET CT CT CT HMI IGBT...
Page 78: ...2 10 Figure 2 5 The two side boards and removal method SVG300 Unit mm inch...
Page 81: ...Product Installation 2 13 Figure 2 7...