11
ENGLISH
Operation and installation manual SOLIVIA 5.0 EU G3
6.7
Connection of PV modules
Before the photovoltaic system is connected, the polarity of the PV voltage at the Tyco connectors
must be checked to ensure that it is correct.
The connection of the PV module is implemented using Tyco Solarlok connectors, where the DC
negative pole is located on the connector upper row and the DC positive pole on the connector
lower row. The connectors are color coded to prevent you from accidentally plugging them into the
wrong terminal.
Please ensure the following at all times:
• That there is never any risk of anyone coming into contact with the solar inverter connection
terminals, due to the risk of dangerous voltages across them.
• That under no circumstances are the PV modules to be disconnected from the solar inverter under
load. If a disconnection should be necessary, first switch the grid off so that the solar inverter
cannot absorb any further power. Next, open the upstream DC disconnector.
The maximum input voltage of the solar inverter is 540 V. The maximum current load of each indi-
vidual Tyco connector is 18 A.
The solar inverter has an insulation and grounding monitoring on the DC side. The options can be
configured in the Setup menu “S -> Solar ISO / GND” (see § 7.3.8.1).
The insulation monitoring has two modes:
• ISO-ON-Error (the solar inverter is disconnected from the grid in the event of an insulation
fault)
• ISO-ON-Warning (the solar inverter indicates the fault but is not disconnected from the grid).
Deltas solar inverters are factory-set to ISO-ON-Warning mode on delivery.
The grounding monitoring has two modes:
• PV+ grounding (grounding monitoring of the positive pole of the PV generator)
• PV- grounding (grounding monitoring of the negative pole of the PV generator).
In these modes the solar inverter remains in feed-in operation and will not be disconnected from the
grid in case of a fault. The error message “PV+ grounding fault” or “PV- grounding fault” will appear
on the display.
If you need to connect the positive or negative pole of the PV system to meet requirements set
out by the module manufacturer, you can do this. Earth continuity must be implemented close to
the inverter. We suggest using Deltas grounding kit “Grounding Set A Solar” (EOE 99000115). The
grounding connection is monitored and should be configured in the Setup menu (see above).
Alternatively, it is possible to turn off the insulation- and grounding monitoring:
• ISO / GND OFF.
Summary of Contents for SOLIVIA 5.0
Page 1: ...Operation and installation manual for SOLIVIA 5 0 EU G3 5 0 EU...
Page 2: ......
Page 4: ...2 Operation and installation manual SOLIVIA 5 0 EU G3...
Page 40: ...38 Bedienungsanleitung SOLIVIA 5 0 EU G3 Bedienungsanleitung SOLIVIA 5 0 EU G3...
Page 42: ...40 Bedienungsanleitung SOLIVIA 5 0 EU G3 Bedienungsanleitung SOLIVIA 5 0 EU G3...
Page 78: ...76 Manuale di istruzioni SOLIVIA 5 0 EU G3...
Page 80: ...78 Manuale di istruzioni SOLIVIA 5 0 EU G3...
Page 192: ...190 Manual de instru es SOLIVIA 5 0 EU G3...
Page 194: ...192 Manual de instru es SOLIVIA 5 0 EU G3...
Page 230: ...228 N vod k obsluze SOLIVIA 5 0 EU G3...
Page 232: ...230 N vod k obsluze SOLIVIA 5 0 EU G3...
Page 306: ...304 Handleiding SOLIVIA 5 0 EU G3 Handleiding SOLIVIA 5 0 EU G3...
Page 308: ...306 Handleiding SOLIVIA 5 0 EU G3 Handleiding SOLIVIA 5 0 EU G3...
Page 344: ...342 SOLIVIA 5 0 EU G3...
Page 346: ...344 SOLIVIA 5 0 EU G3...
Page 351: ...349 SOLIVIA 5 0 EU G3 4 3 1 2 3 RS485 EIA485 4 5 3 1 2 4 3 5...
Page 359: ...357 SOLIVIA 5 0 EU G3 6 9 Solar Inverter MPP Booster DC Bus DC DC DC DC A B C D AC...
Page 378: ...376 SOLIVIA 5 0 EU G3 DC 1 2 3 L1 N PE L2 N PE L3 N PE L1 N n PE L2 L3 Solivia 5 0...
Page 381: ...379 SOLIVIA 5 0 EU G3 12 https guarantee solar inverter com SOLIVIA 5 10 5...
Page 382: ...380 Operation and installation manual SOLIVIA 5 0 EU G3 13 Certificates...
Page 383: ...381 Operation and installation manual SOLIVIA 5 0 EU G3...
Page 390: ...388 Operation and installation manual SOLIVIA 5 0 EU G3 Notes...
Page 391: ......