RTU-CN01 Operation Manual
4-4
_4
TAP-CN03
DV
P-
04
AD
DV
P-
04
D
A
DV
P-
16
SP
CANopen
Master
DV
P-
04
AD
DV
P-
16
SP
CA Nopen
CA Nopen
DV
P-
04
DA
CAN+
SHLD
CAN
G ND
R
TU
-C
N
01
CAN +
SHLD
C AN
G ND
R
TU
-C
N
01
4.4
Wiring
4.4.1
Power Input
The power input of RTU-CN01 is 24VDC. Please notice the following points during use.
Connect the supply power to the two terminals, 24V and 0V and the grounding terminal to the earth.
Be cautious that the RTU-ECAT device may be damaged if the positive and negative polarities of
the supply power are connected reversely.
Please be sure to use certified power supply with SELV output or certified power supply providing
double insulation evaluated by UL60950, or UL61010-1 and UL61010-2-201 standards
Use copper conductors as power wires only. The diameter of the power wire must be between 12
and 28AWG and the rated temperature should be greater than 70°C. The power terminal block plug
wiring torque is 4.5 in-lbs.
The cables for the 110V and 220V AC power supply and the 24V DC power supply must be twisted
and connected to the module as short as possible in length.
Do not combine the AC 110V, 220V, and DC 24V cables with the main circuit and I/O signal cables
together and please keep them away from each other. If the space permits, it’s recommended to
separate these lines by more than 100mm.
Summary of Contents for RTU-CN01
Page 11: ...RTU CN01 Operation Manual 2 6 _2 MEMO...
Page 43: ...RTU CN01 Operation Manual 5 22 5 MEMO...
Page 53: ...RTU CN01 Operation Manual 6 10 _6 MEMO...
Page 68: ...Chapter 7 Application Examples 7 15 7_ Note Baud rate conversion 1 Mbps 1000 Kbps 1000000bps...
Page 75: ...RTU CN01 Operation Manual 7 22 _7 The complete configuration of Send PDO mappings is as below...