8 Commissioning
8.
Commissioning
The inverter must be installed correctly, see “7. Installation”,
page 45.
For information on operating the display buttons, see “7. Installa-
tion”, page 45.
In order for the commissioning to be carried out, the
inverter must be supplied with alternating current
(grid) or direct current (solar modules).
1.
Turn the DC disconnector to the
ON
position.
→ The inverter runs through an internal check that can take
up to 2 minutes. The remaining time is shown on the
display.
2.
Use the
and
buttons to select a country or grid.
Custom
UK G59/3 240V
UK G59/3 230V
21. Jun 2013 09:30
Country Setting - 6/6
Country
Available grids
United Kingdom
UK G59/3 230V
UK G59/3 240V
3.
Press the
ENT
button to confirm.
4.
Press the
ENT
button to confirm the selection.
Are you sure to set country:
Are you sure to set country:
UK G59/3 230V
No
No
Yes
Yes
21. Jun 2013 09:30
Confirm country
5.
Use the
and
buttons to select a language.
English
Deutsch
Français
Français
Italiano
Español
Español
Nederlands
21. Jun 2013 09:30
Select language
þ
The commissioning is concluded. The main menu is dis-
played.
E-Today
Power Meter
Energy Log
Event Log
Inverter Information
Settings
Operation Data
21. Jun 2013 09:30
Menu
► Using chapter “9. Settings”, page 72, check if
you need to make other settings.