103
Installation and Operating Manual for RPI M15A M20A Solar Inverter V1.0 2016-03-18
9 Settings
5.
Using the
and
buttons, select the
EP0 1
entry and
press the
ENT
button.
30
[
]
10
[
]
3P4W
[
]
S
%/m
Grid err. Lock
EPO 2
EPO 1
Dry contact
Normal Open
[
]
Normal Open
[
]
Ramp-up Power
Reconnection Time
AC Connection
OFF
[
]
21. Jun 2013 09:30
Install Settings
→ The currently set option is highlighted and can be
changed.
30
[
]
10
[
]
3P4W
[
]
S
%/m
Grid err. Lock
EPO 2
EPO 1
Dry contact
Normal Open
[
]
Normal Open
[
]
Ramp-up Power
Reconnection Time
AC Connection
OFF
[
]
21. Jun 2013 09:30
Install Settings
6.
Use the
and
buttons to select an option.
30
[
]
10
[
]
3P4W
[
]
S
%/m
Grid err. Lock
EPO 2
EPO 1
Dry contact
Normal Close
[
]
Normal Open
[
]
Ramp-up Power
Reconnection Time
AC Connection
OFF
[
]
21. Jun 2013 09:30
Install Settings
7.
Press the
ENT
button to confirm.
þ
The relay is set.
30
[
]
10
[
]
3P4W
[
]
S
%/m
Grid err. Lock
EPO 2
EPO 1
Dry contact
Normal Close
[
]
Normal Open
[
]
Ramp-up Power
Reconnection Time
AC Connection
OFF
[
]
21. Jun 2013 09:30
Install Settings