Chapter 3 : Operation Modes
The SVG is applicable to many applications and can meet the particular installation
requirements of industrial sites, power distribution rooms and IT data centers. According to
different work conditions and environment requirements, SVG modules can be installed in a
standard or customized cabinet. Flexible configurations and on-site capacity expansion can
also be achieved based on current and subsequent capacity requirements.
3.1 Pre-installation
Confirmation
Since the installation environment varies for different users, please be sure to read this
Manual carefully before installation. All installation, assembly and start-up work must be
carried out by the qualified professional personnel. If the work is to be carried out by the
customer, it shall be under the supervision of the qualified professional personnel. When a
forklift or similar lifting equipment is used to handle the device, make sure the lifting capacity
is sufficient. Please refer to
Table 2-10
for the SVG weight,
3.2 Installation
Environment
1.
SVG system must be installed indoors. Outdoor installation is strictly prohibited. Please
take into full consideration the equipment’s standard IP30 or IP54 protection rating.
2.
SVG equipment shall not be placed in a sandy/dusty area or a heavily polluted
environment. If installation in such environment is required, please confirm what
precaution measures shall be taken with Delta or Delta's distributor. Electrically
conductive dust particles can damage the equipment. Please make sure that there are
no such particles present inside the installation area.
3. Please make sure that the passageways and the placement location are large enough
to accommodate the forklift and system cabinet, and verify that the installation location
is capable of withstanding the weight.
4. While the SVG is operating, it makes sound at a certain noise level. Please take the
noise into consideration when deciding where to install and place the unit.
5. The installation location must be kept clean and tidy. Please make sure that the input
wires are properly sealed to prevent rats from rodent damage.
6. Please make sure that the installation area is spacious enough for conducting
maintenance work. While installing the SVG, we suggest that the ventilation inlet
openings shall be at the front and that the ventilation outlet openings shall be at the
back. Maintain a clearance of 1,000 mm at the front and back of the SVG cabinet for
operation, maintenance, and wiring. When installation against the wall is required, top-
airflow type cabinet shall be selected. Please consult Delta or Delta’s distributor for
cabinet’s airflow type. Corresponding ventilation fans shall be installed to satisfy the
SVG ventilation requirement.