![Delphi YDT-35 Operating And Servicing Manual Download Page 38](http://html1.mh-extra.com/html/delphi/ydt-35/ydt-35_operating-and-servicing-manual_2471083038.webp)
YDT-35 Operating and Servicing Manual
38
HL066(EN) ISSUE 1, 05/2015
Follow the on-screen instructions:-
ISF .EJBR-######
Make all necessary connections
to the injector
When ready press START.
Figure 4.19 ISF Test Instruction Screen
Refer to Figure 4.20.
When ready, press the Start key.
The Spray chamber is illuminated to aid visual checks of the injector spray pattern during the test.
Each test step runs automatically. The operator can perform the following functions during a test:-
Adjust the High Pressure using the regulator
Advance to the next test step or repeat a previous step via left and right arrow keys
Press STOP twice in order to cancel the ISF Test
ISF .EJBR-######
►>>1 >>2 >>3 >>4
IPM
us
500
600
START=Test, STOP=Next
Bar: 0800
Figure 4.20 ISF Test Step Start Screen
THIS IS AN UNCONTROLLED DOCUMENT downloaded by Lukas Matuska on 16 Feb 2016
Any technical intervention requires certified Hartridge training. Contact Hartridge Ltd for details.