e. Select
I/O Modules
.
f. In the right pane, right-click the module, then click
Request Swap Clear
.
g. Click the
Alerts
tab.
h. Right-click the alerts for the temperature sensor and I/O modules, then click
Acknowledge
.
NOTE: The alerts may not appear immediately. If the alerts do not appear, wait 10 seconds
and then click
Refresh
.
12.
Clear the swap status for the temperature sensor and acknowledge the alert.
a. Click the
Hardware
tab.
b. In the
Hardware
tab navigation pane, expand the enclosure.
c. Select
Temperature Sensors
.
d. In the right pane, right-click the sensor, then click
Request Swap Clear
.
e. Click the
Alerts
tab.
f. Right-click the alert and select
Acknowledge
.
NOTE: The alert may not appear immediately. If the alert does not appear, wait 10 seconds
and then click
Refresh
.
13.
Shut down the other storage controller and repeat the previous steps.
Next steps
Use SupportAssist to send diagnostic data to Dell Technical Support.
Replace Both Storage Controllers Simultaneously
If you need to replace both storage controllers at the same time, contact Dell Technical Support for
assistance.
Replacing Rack Rails
Rack rails are used to install the SCv2080 storage system into a rack.
Prerequisites
1.
Use SupportAssist to send diagnostic data to Dell Technical Support.
2.
Shut down the storage system using the Dell Storage Client.
About this task
NOTE: Replacing rack rails must be performed during a scheduled maintenance window when the
Storage Center system is unavailable to the network.
Steps
1.
Make sure all the cables are labeled.
2.
Disconnect all the cables from the storage system.
3.
Remove the plastic covers from the chassis ears.
4.
Remove the screws that secure the chassis to the rack.
5.
Remove the storage system from the rack rails.
WARNING: Do not attempt to the lift the storage system by yourself. Always have assistance
when lifting the storage system. If installed above the lower 20U of a rack, a customer-
provided mechanical lift must be used to avoid injury.
6.
Remove the rack rails from the rack.
7.
Install the replacement rack rails in the rack.
42
Replacing SCv2080 Storage System Components