3
Connect the intrusion switch cable to the connector on the system board.
Figure 31. Installing the intrusion switch
Next steps
1
Install air shroud. For more information see
2
Follow the procedure listed in
After working inside your system
.
Drives
Drives are supplied in hot swappable drive carriers that fit in the drive slots.
CAUTION:
Before attempting to remove or install a drive while the system is running, see the documentation for the storage
controller card to ensure that the host adapter is configured correctly.
CAUTION:
Do not turn off or restart your system while a drive is being formatted. Doing so can cause a drive failure.
When you format a drive, allow enough time for the formatting to complete. Be aware that high-capacity drives can take a long time to
format.
Removing a drive blank
The procedure for removing 2.5 inch and 3.5 inch drive blanks is identical.
Prerequisites
1
Follow the safety guidelines listed in
2
If installed remove the front bezel. For more information, see
.
CAUTION:
To maintain proper system cooling, drive blanks must be installed in all empty drive slots.
CAUTION:
Mixing drive blanks from previous generations of PowerEdge servers is not supported.
Step
Press the release button, and slide the drive blank out of the drive slot.
Installing and removing system components
69