4. Insert the screw into the hole of the eBox and screw the eBox into place using a T10 Torx screwdriver.
The top cover of the eBox should be flush with the rover body.
Inserting the gBox
1. As much as possible, loosen the Velcro strap in the payload bay around the position of the gBox cavity.
2. Pull the power and signal cable and the GNSS antenna cable out of the ducts in the payload bay. Do
not use any sharp tools. To identify each cable, see
.
3. Connect the power and signal cable to the gBox.
CAUTION –
The connector of the power and signal cable is fragile. Make sure to handle it with
care.
4. Connect the GNSS antenna cable to the gBox and firmly tighten the connector using the wrench
provided with the gBox. Do not over-tighten. The wrench provided is designed to prevent over-
tightening.
5. Insert the cables back into the cable ducts. Do not use any sharp tools.
6. With the LEDs facing upward, insert the gBox into the payload bay of the rover body.
55
Delair-Tech
|
676, Rue Max Planck – 31670 Toulouse-Labège, France
|
Tel: +33 (0) 5 82 95 44 06
|
Capital: 238 110,30 € - APE: 3030Z – Intra-Community VAT number: FR90 53 09 69 781 – 530 969 781 R.C.S. Toulouse
This document is the sole property of Delair-Tech and cannot be used or reproduced without the written authorization of Delair-Tech
.