![Delachaux Conductix-Wampfler 0314 Series Installation Manual Download Page 55](http://html1.mh-extra.com/html/delachaux/conductix-wampfler-0314-series/conductix-wampfler-0314-series_installation-manual_2465764055.webp)
Installation Manual
Festoon Systems for I-Beams
Program 0314
MAL0300-0001-EN
www.conductix.com
translated document
page 55 of 56
11.5
Final inspection protocol
Customer:
Customer number.:
Order no.:
Contractor:
Order acceptance no.:
Construction
location:
Project name:
Address
Postal code:
City:
Contact person / phone number:
Meeting place:
Start of installation (on site)
End of installation (on site)
Installation time required (in hours):
Travel time required (in hours):
Installation of the above project was concluded today by Conductix-Wampfler GmbH, Germany.
Risk is transferred to the customer today.
The acceptance was confirmed in the customer- Yes
specific "Handover" protocol:
Attachment:
The maintenance instructions were handed out: Yes
CE label was attached: Yes
Customer remarks:
Supplier remarks:
The following tasks included in the order could not be carried out:
Contact for installation (Conductix-Wampfler GmbH)
Contact for construction (customer)
Name:
Name:
Date:
Signature:
Date:
Signature: