
4.8.2 Start sequence
The following drawings illustrate the start sequences of the genset with normal start prepare and extended
start prepare.
No matter the choice of start prepare function, the run coil is activated before the start relay (starter). The time
between the run coil and the start relay is setup in parameter 6151. In the following drawings this time is set
to 1 sec.
Start sequence:
Normal start prepare
t
OFF
t
OFF
1 sec.
2nd start attempt
1st start attempt
3rd start attempt
Crank (starter)
Start prepare
Stop coil
Run coil
Running feedback
CGC 400 DRH 4189340786 UK
Functional descriptions
DEIF A/S
Page 33 of 96