
4.6.4 Load takeover
G
Controller
Load
4.7 Flowcharts
4.7.1 Flowcharts
Using flowcharts, the principles of the most important functions will be illustrated in the next sections. The
functions included are:
●
Mode shift
●
MB open sequence
●
GB open sequence
●
Stop sequence
●
Start sequence
●
MB close sequence
●
GB close sequence
●
Load takeover
●
Island operation
●
Automatic Mains Failure
●
Test sequence
The flowcharts on the following pages are for guidance only. For illustrative purposes, the
flowcharts are simplified in some extent.
CGC 400 DRH 4189340786 UK
Functional descriptions
DEIF A/S
Page 20 of 96