![DeDietrich IX 145-110 Installation And Service Manual Download Page 33](http://html1.mh-extra.com/html/dedietrich/ix-145-110/ix-145-110_installation-and-service-manual_2462473033.webp)
5.5
Unpacking & initial preparation
1. Remove the cardboard packaging.
2. Remove the plastic protection and the polystyrene cover.
Caution
Recycle the cardboard into recycling bins.
The plastic sleeve and the polystyrene should be put into the
household waste.
Danger
There is a risk of suffocation, keep out of reach of children.
3. Remove the front panel by pulling firmly on the notches provided.
4. Remove the four screws holding the boiler in place on the pallet.
5. Take the condensates hose that you will find in the boiler and connect
it to the condensates discharge.
6. Put the boiler in its intended position.
Caution
Moving the boiler is a job for two people.
7. Level the boiler using the adjustable feet.
Fig.28
MW-3000016-2
1
2
Fig.29
MW-3000017-02
3
4
x3
5 Before installation
7702703 - v04 - 05092019
IX
33