1.
The two-core cable from the release coil must pass through the
cable gland (PG) on the underside of the wallbox. This cable gland
has two Ø5 mm blind holes, one for the two-core cable from the
release coil, the other for the Power Management (see Dynamic
Power Management Manual). To insert the cable, break the blind
bottom of the hole using a screwdriver.
44
Summary of Contents for DazeBox C
Page 1: ...DAZEBOXC Installation Manual...
Page 3: ...3...
Page 11: ...11...
Page 29: ...29...
Page 30: ...Wiring diagram of three phase DazeBox 30...
Page 33: ...33...
Page 57: ...57...
Page 67: ...The relative humidity of the air must not exceed 95 and condensation must be avoided 67...
Page 69: ...69...
Page 70: ...NOTES 70...
Page 71: ...71...
Page 72: ...72...