![DazeTechnology DazeBox C Installation Manual Download Page 41](http://html2.mh-extra.com/html/dazetechnology/dazebox-c/dazebox-c_installation-manual_3926403041.webp)
1.
Insert the power cables into the cable gland (A). We recommend using
flexible cables with the following maximum cross-section: 6 mm2. Or if
from underneath, insert the cables through the hole drilled in the
bottom of the wallbox. See Section 4.4.
2.
Shorten connecting cables to the appropriate length (avoid leaving too
much cable margin). Use ferrule tips.
3.
Connect line 1 (L1), line 2 (L2), line 3 (L3), neutral (N) and earth
conductor (PE), as indicated on the board, to the push-lock terminals
without the use of tools.
In the case of connecting several DazeBoxes to the same three-phase
system, it is recommended to "rotate the phases", i.e. if the L1-L2-L3-N
supply terminals of the first DazeBox are connected with L1-L2-L3-N of the
41
Summary of Contents for DazeBox C
Page 1: ...DAZEBOXC Installation Manual...
Page 3: ...3...
Page 11: ...11...
Page 29: ...29...
Page 30: ...Wiring diagram of three phase DazeBox 30...
Page 33: ...33...
Page 57: ...57...
Page 67: ...The relative humidity of the air must not exceed 95 and condensation must be avoided 67...
Page 69: ...69...
Page 70: ...NOTES 70...
Page 71: ...71...
Page 72: ...72...