background image

17

MCS System

At any point during this sequence, the audible chirp or alarm can be deferred for 

seven days by holding the controller button down for a period of five seconds. 

The number of deferrals used will be displayed as below. Once the deferral expires, 

the alarm will sound once again. The deferral can be repeated up to three times. 

PLEASE NOTE:

 At any point after lamp expiration, the water may be unsafe for 

consumption and should not be consumed without another form of disinfection.

MCXS System

MCS System

System Service Suggested

MCXS controllers will display the System Service Suggested Screen 

every 6 months to remind consumers to maintain both their UV and 

other prefiltration. This will serve as a prompt only and will not put 

the system into alarm. To clear this condition simply press the button 

located below the screen.

Lamp Replacement (MCS systems)

After the lamp is expired, it must be replaced with the same part number as indicated 

by the label on the chamber. Begin replacing the lamp by unplugging the power for the 

controller, then refer to 

Installation

, starting with step 11 (page 11) for instructions on 

installing the new lamp. To reset the timer in the controller, firmly hold down the button 

on the controller for 10 seconds. The controller will read “rSt3”, “rSt2”, “rSt1” and then 

beep. The button can now be released, the lamp countdown timer has been reset. 

The lamp key that comes with the replacement lamp will not be required on the MCS 

system and can be discarded.

Lamp Replacement (MCXS systems)

After the lamp is expired, it must be replaced with the same part number as 

indicated on the Maintenance Parts screen or on the label on the chamber. With 

the system powered down, remove and discard the lamp key from the controller. 

The replacement lamp is packaged with a lamp key on the connector at the end 

of the lamp. Remove the key from the lamp and place it in the controller. Refer to 

Installation, starting with step 11 (page 11) for instructions on installing the new lamp.

QR Codes

(Only on MCXS controllers MCXS-CONT) A QR code (Quick 

Response code) is a matrix barcode first designed for the automotive 

industry. Microlene uses the QR code to store a link to our website. 

Users with a camera phone equipped with the correct reader 

application can scan the image of the QR code and over a wireless 

network connect to our web page in the phone’s browser.

Summary of Contents for microlene MCS

Page 1: ...he operator of this equipment Aquashield Centurion 3 Stage UV Disinfection System Models MCS MCXS without cartridges KMCS KMCXS with cartridges included Installation and Operating Instructions Flow Rate 30mJ cm2 95 UVT 57 L min AS NZS 3497 ...

Page 2: ... reassurance that your family will have access to safe drinking water throughout your entire home protecting from microbiological contamination This is a chemical free process which is simple in its concept and effective in its abilities to inactivate microorganisms present in the water supply Simple maintenance Continuous disinfection Safe water Microlene makes it that easy These instructions are...

Page 3: ...Operation 13 MCS Controllers 14 MCXS Controllers 14 MCXS Power up Sequence 14 MCXS Operational Screens 15 MCXS with optional sensor Operational Screens 16 Lamp Countdown Sequence 16 Lamp Replacement MCS systems 17 Lamp Replacement MCXS systems 17 QR Codes 17 System Troubleshooting 18 Temperature Management Devices 19 Expansion Modules 20 Microlene Aquashield Centurion UV System Specifications 21 L...

Page 4: ...l capabilities or lack of experience and knowledge unless they have been given supervision or instruction 6 Children should be supervised so that they do not play with the appliance 7 To avoid possible electrical shock use only with a properly earthed electrical outlet Appliances that are obviously damaged must not be operated 8 Never perform any maintenance to the system unless you are comfortabl...

Page 5: ...erials Inlet outlet connections Teflon thread tape Water Quality Parameters UV disinfection is extremely effective against microorganisms but only if the UV light can pass through the water it needs to treat This means that the quality of your water is very important in order to ensure complete disinfection Treated water should be tested for at least the parameters listed below If the water exceed...

Page 6: ... MC HOSL 7 UV Chamber 8 Clamps 9 Flexible Hose 10 Mounting Plate 11 Filter Cartridges Only KMCS and KMCXS have filters included Part 20PP20J 20 20 micron sediment Part 1PS20J 20 1 micron sediment 12 Filter Housings Part DM160018 double filter housing two 20 sumps and caps 13 Mounting Screws 14 Filter Wrench Part WFH45 15 UV Sensor optional module Part MCXS UVS 16 IEC Power Cable Part MC CONT PC Au...

Page 7: ...or above the chamber IMPORTANT All Microlene Aquashield Centurion UV Disinfection Systems are intended to be installed under a weather proof cover and should not be exposed to the elements MCS C Weather proof cover purchased separately Protects the chamber and controller from rain and direct elements Enables the 3 Stage UV system to be set up left to right or right to left for ease of installation...

Page 8: ...cating water flow which now should be indicating a flow direction of right to left Figure 2 System Orientation water inlet Step 4 Remove the stainless steel UV chamber from the two plastic clamps located on the top of the rack Carefully remove the top straps securing the chamber with the aid of a standard slot screwdriver Rotate the chamber 180 degrees with the inlet now facing to the left and the...

Page 9: ...gently remove the quartz sleeve from its packaging being careful not to touch the sleeve or lamp with your hands The use of cotton gloves is recommended for this procedure as oils from the hands can leave residue on the sleeve and lamp which can ultimately block the UV light from getting to the water Carefully slide the sleeve into the chamber until you can feel it hit the opposite end of the cham...

Page 10: ... controller Align the flat portion so it faces the gland nut end and matches up with the half metal lip on the sensor port see Figure 6 Insert the sensor so it is fully seated and hand tighten the sensor nut Insert the sensor connector into the IEP port located on the right side of the controller Figure 7 For the sensor to be recognized by the controller the controller power must be plugged in las...

Page 11: ... lamp Note the keying for proper alignment see Figure 8 Insert the lamp connector into the gland nut and turn the connector approximately turn to lock the connector to the gland nut as in Figure 10 Figure 9 Lamp Key Installation Figure 10 Lamp Connector Step 12 Tighten the captive earth screw to the earth lug on the UV chamber to ensure proper earthing Figure 11 Earth Screw Connection Step 13 Your...

Page 12: ...ng Step 4 Reinstall the filter cartridge into the sump and flush the chlorine solution by opening all faucets until chlorine can no longer be detected Your home has now been completely disinfected with your Microlene Aquashield Centurion UV system ready to inactivate any microorganisms that enter the home Cleaning the Quartz Sleeve Depending on the water quality the quartz sleeve may require perio...

Page 13: ...ise sensor nut from the chamber and pull the sensor slowly out of the sensor port Step 6 Holding the sensor in your hand wipe the flat portion sensor face of the sensor with isopropyl alcohol using a clean lint free cloth Step 7 Replace sensor following step 9 from the installation section of the manual Operation Microlene systems come with a feature laden controller that incorporates both the lam...

Page 14: ...ription of the system s performance in addition to providing any applicable fault messages and system diagnostics The controller can be used as both a non monitored and UV monitored system If a true UV monitor is required simply add the optional UV sensor module to the infinite expandability port located on the right side of the controller Simply plug in an optional UV sensor module into the expan...

Page 15: ... ready to disinfect water flow all detected modules lamp reaching max output successful start up MCXS Operational Screens On systems without the UV monitor the default screen shows the Microlene Home Screen At any point during operation the user is able to scroll through the Microlene Home Screen Lamp life remaining QR Code Contact Info and Maintenance Parts screens by pressing the button located ...

Page 16: ...tant audible alarm is given This alternates with a screen indicating water may be unsafe for consumption With the solenoid module the controller de activates the solenoid valve shutting off all water flow audible chirp every 15 seconds audible chirp every 15 seconds constant audible alarm cycles with red low uv screen Lamp Countdown Sequence The system counts down the number of days until a lamp c...

Page 17: ...with step 11 page 11 for instructions on installing the new lamp To reset the timer in the controller firmly hold down the button on the controller for 10 seconds The controller will read rSt3 rSt2 rSt1 and then beep The button can now be released the lamp countdown timer has been reset The lamp key that comes with the replacement lamp will not be required on the MCS system and can be discarded La...

Page 18: ... the chamber or on the Maintenance parts screen Low UV Intensity Remove and clean the quartz sleeve and sensor Check water quality meets requirements on page 5 and add filtration as required Replace lamp Wrong lamp or sensor installed Replace component with proper model as indicated The UV sensor is no longer communicating with the system Ensure all modules are connected properly to the system and...

Page 19: ... heading Boil Water Advisory If any failure occurs on a Microlene UV system the water must not be used for human consumption until the system is returned to a safe operational mode If the water is used for human consumption during this period the water must be boiled minimum 20 minutes at a full boil prior to consumption Temperature Management Devices Your Microlene system is designed to run conti...

Page 20: ... of contacts In normal operation the OK and COM contacts will be connected and in a fault condition Low UV Lamp fail Power Fail the Fault and COM contacts will be connected Maximum Contact Rating is 30V 1A use 16 22 AWG Order PN DMMOD RAM SOLENOID CONNECTION MODULE Connects a NORMALLY CLOSED line voltage solenoid valve to the controller On a non monitored system the solenoid will only close on a l...

Page 21: ...lamp Power Watts 57 48 230V Replacement Lamp MC HOLP Replacement Sleeve MC HOSL Chamber Dimensions 8 9 x 50 8 cm 3 5 x 20 Chamber Material Polished 316L Stainless Steel A249 Pressure Rated Tubing Controller Dimensions 21 8 x 10 7 x 8 9 cm 8 6 x 4 2 x 3 5 Operating Pressure 827kPa 120PSI Operating Water Temperature 2 40 C 36 104 F UV Monitor not available OPTIONAL optional UV module sold separately...

Page 22: ...22 NOTES ...

Page 23: ...23 ...

Page 24: ...of date of original purchase If requested return the product and or provide further information with respect to the claim Returning the product to the place of purchase is at your cost and is your responsibility The warranty claim will be assessed by Davey on the basis of their product knowledge and reasonable judgement and will be accepted if a relevant defect is found the warranty claim is made ...

Reviews: