GUIDE TO INSTALLATION
The following can be used as a checklist to verify all of the steps necessary for
complete installation of the C-BOX 4X0.
1) Read all information in the section "Safety Precautions" at the beginning of this
manual.
2) Correctly position and mount the C-BOX 4X0 within the reach of the barcode
scanner cable, according to the information in paragraph 2.3.
3) Provide correct system cabling according to the signals necessary for your
application and DeviceNet settings (see all sub-paragraphs under 2.4).
The installation is now complete.
iv
Summary of Contents for C-BOX 400
Page 1: ...C BOX 400 410 Installation Manual...
Page 2: ......
Page 3: ...C BOX 400 410 INSTALLATION MANUAL...
Page 8: ...C BOX 410 2 1 Figure B LCD display Keypad 1 2 vi...