![Danfoss VLT Automation Drive FC 300 Operating Instructions Manual Download Page 43](http://html1.mh-extra.com/html/danfoss/vlt-automation-drive-fc-300/vlt-automation-drive-fc-300_operating-instructions-manual_3441740043.webp)
Illustration 3.57: Installation of bottom duct
After the bottom ductwork has been posi-
tioned in place, remove the three T25 screws
from the outer holes in the mounting brackets
on the sides and front of ductwork and move
them to the inner holes of the same brackets.
Tighten the three screws to the specified tor-
que. The bottom duct work is not fastened to
Rittal enclosure.
Illustration 3.58: Move mounting screws from the
outer hole to the inner hole
Install the front cover of the duct and the ca-
ble clamp base if used. Install the two remain-
ing gland plates.
Illustration 3.59: Bottom duct installed.
VLT
®
Automation Drive FC 300
Operating Instructions High Power
3. How to Install
MG.33.U1.02 - VLT
®
is a registered Danfoss trademark
43
3