3. How to Install
3.1. How to Get Started
3.1.1. About How to Install
This chapter covers mechanical and electrical installations to and from power terminals and control
card terminals.
Electrical installation of
options
is described in the relevant Operating Instructions and Design
Guide.
3.1.2. How to Get Started
The frequency converter is designed to achieve a quick and EMC-correct installation by following
the steps described below.
Read the safety instructions before installing the unit.
Mechanical Installation
•
Mechanical mounting
Electrical Installation
•
Connection to Mains and Protecting
Earth
•
Motor connection and cables
•
Fuses and circuit breakers
•
Control terminals - cables
Quick setup
•
Local Control Panel, LCP
•
Automatic Motor Adaptation, AMA
•
Programming
Frame size is depending on enclosure type,
power range and mains voltage
Illustration 3.1: Diagram showing basic installa-
tion including mains, motor, start/stop key, and
potentiometer for speed adjustment.
VLT
®
Automation Drive FC 300
Operating Instructions High Power
3. How to Install
MG.33.U1.02 - VLT
®
is a registered Danfoss trademark
11
3