background image

Instruction  

SONOMETER™ 1100

Once the meter has been installed, the components (calculator, vol-
ume measuring component and both temperature sensors) must be 
sealed and the meter taken into operation.

Bleed the system until the flow rate display is steady.
Check the display for a plausible indication of flow rate and 
temperatures.

6.0  Start-up operation

The energy meter has two slots for expansion modules. The modules 
can be used and combined as shown in the table. The analogue mod-
ule needs both slots. Integrated radio is always possible. The analog 
module occupies both positions.

7.1 Installation of modules

1. Open the calculator by releasing the side fasteners
2. Lock the module into the appropriate slot and carefully connect 

the pre-formed ribbon cable at both ends.

3. Close the lid and check the meter for correct operation by pressing 

the push button (loop 3). Renew the seal of the housing lid if the 
meter functions correctly.

The relevant ESD regulations (electrostatic discharge) must be 
observed. 
No liability is accepted for damage (especially to electronic circuits) 
resulting from failure to comply with the ESD regulations.

These modules have no effect on consumption recording and can 
be fitted retrospectively without damaging the verification mark.

interface / slot 2

 n

o m

o

d

u

le

 M

-B

us

 R

S2

32

 R

S

4

85

 pu

lse

 in

pu

t

L-

B

u

(f

o

r e

xt

er

n

al

 

ra

d

io)

in

te

rf

ac

e / s

lo

t 1

no module

M-Bus

RS232

RS485

pulsse input

pulse output

• 

pulse in-/ 

output

analogue 

output 

4...20mA

L-Bus 

(for external 

radio)

• combination is possible
– combination is not possible
* integrated radio is always possible

   

7.0  Expansion modules

1 Slot 1
2 Slot 2
3 Fixing clips

Danfoss District Energy 

 

 

 

 

VI.SH.K1.02 

 

 

 

               DEN-SMT/PL

5

Summary of Contents for SONOMETER 1100

Page 1: ...Sheet FW510 If water additives are used e g corrosion protection the user must make sure that the corrosion resistance is adequate The specified medium temperature is 5 90 C 105 C 130 C 150 C The tem...

Page 2: ...low sensor in a tilted 45 position The minimum system pressure must be 1 bar to avoid cavitation Make sure the energy meter is installed sufficiently far away from possible sources of electromagnetic...

Page 3: ...be inserted as far as the bottom of the pocket and then secured The pockets are best installed inT pieces with a 45 or 90 angle The tip of the pocket must point in the opposite direction to the direct...

Page 4: ...on pressing button and the date and time are still updated but none of the measuring functions work incl the flow rate measurement Communication still functions over the optional M Bus RS485 and RS23...

Page 5: ...e formed ribbon cable at both ends 3 Close the lid and check the meter for correct operation by pressing the push button loop 3 Renew the seal of the housing lid if the meter functions correctly The r...

Page 6: ...tandard and is encrypted Reading modes Walk By Drive By Fixed Network For problematic radio installations shield the external radio module set can also be used 8 2 M Bus communication module The M Bus...

Page 7: ...nd can be used as the supply for a flow sensor The pulse output has the same characteristics as pulse output 1 speci fied under 8 6 It is not however electrically isolated 8 8 Analogue output function...

Page 8: ...Future accounting date 1 2 3 Accounting date 1 previous year Accounting date 1 previous year energy Accd 1L 2 4 Accounting date 2 Accounting date 2 energy Accd 2A 2 5 Accd 2 Future accounting date 2...

Page 9: ...prox 4 minutes The error display disappears automatically as soon as the cause of the error has been cleared All errors present longer than 6 minutes are saved in the error log Error code Description...

Page 10: ...Instruction SONOMETER 1100 VI SH K1 02 Produced by Danfoss A S 12 2014...

Reviews: