SiENBE04-808_A
Trial Operation and Field Settings
286
Part 8
Trial Operation and
Field Settings
1. Trial Operation ....................................................................................286
2. Field Settings ......................................................................................288
2.1
Model Type Setting ..............................................................................288
2.2
When 2 Units are Installed in 1 Room..................................................288
2.3
Standby Electricity Saving....................................................................289
2.4
Facility Setting Jumper and Switch
(cooling at low outdoor temperature)....................................................290
2.5
Jumper and Switch Settings.................................................................291
3. Application of Silicon Grease to a Power Transistor and
a Diode Bridge ....................................................................................292
SiENBE04-808_A.pdf 298
21/02/2011 13:20:25