
SiENBE04-808_A
Outdoor Unit - RK(X)S42G2V1B, ARXS42G2V1B
Removal Procedure
240
4.2
Removal of Electrical Box
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1. Disconnect the
connecting wires.
When reassembling, fasten
the wires with screws on the
terminal board.
1
Remove the 3 screws
to remove the wiring
fixture.
Then remove the all
screws to disconnect
the power supply
cables and the
connecting wires.
2. Remove the electrical
box.
1
Release the outdoor
temperature thermistor.
2
Lift up the guard net
and remove it.
(R12192)
Power
supply
cable
Connecting
wire
Terminal
board
Wiring fixture
(R12193)
(R8143)
Guard net
SiENBE04-808_A.pdf 252
21/02/2011 13:20:19