
Outdoor Unit - RK(X)S42G2V1B, ARXS42G2V1B
SiENBE04-808_A
245
Removal Procedure
4.3
Removal of PCB
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1
Remove the screw and
remove the electrical
box cover.
Preparation
Remove the panels
according to the “Removal of
Outer Panels”.
Remove the electrical box
according to the “Removal of
Electrical Box”.
2
Detach the insulation
sheet.
The trimmed part goes front.
3
Remove the 2 screws
of the earth terminals.
(R12274)
Electrical box cover
(R8156)
(R8157)
Insulation
sheet
Earth
terminals
(R8158)
SiENBE04-808_A.pdf 257
21/02/2011 13:20:20