background image

Installation manual

11

RZQ71~14 RZQ7 RZQ100~140B8W1B

Split System air conditioners

4PW48323-1B

Total charging weight of the refrigerant (after a leak, 
etc.)

The total charging amounts relate to the refrigerant piping length as
in 

"Maximum total one-way piping length"

  of the table in paragraph

"Allowable pipe length and height difference" on page 6

.  (E.g. twin:

L1+L2).

Table 3: Total charging amount <unit: kg>

Precaution for pumping-down operation

The outdoor unit is equipped with a low pressure switch or a low
pressure sensor to protect the compressor.

Take the following steps to perform the pumping-down operation.

Preliminary measures

Make sure to cut off power supply.
Open the front panel and cover the PCB and terminal board with
insulation sheet to avoid electric shock by accidental touching of
live parts.

Close the front panel before leaving the outdoor unit. You cannot
leave the unit unattended in case the front panel remains opened.

Turn on the power supply and carry out pumping-down operation
according to the following procedure.

Pump down operation

RZQ100~140B

RZQ71~140D

(a) If after finishing pumping-down operation the outdoor unit does not operate, 

not even when the remote controller switch is turned on, the remote controller 
may or may not indicate "

U4

". But this is not a malfunction.

After finishing the pumping-down operation, make sure to
have removed the insulation sheet that was placed in the
switch box as a protective measure like in chapter

"Preliminary measures" on page 11

.

When in need of operation, turn off the main power supply
and turn it on again. Make sure that stop valves both on
liquid and gas side are open and be sure to operate the
unit in cooling operation during test run.

In case of complete recharge of the refrigerant, please first
execute vacuuming. Execute this vacuuming from the
service port. Do not use the port of the stop valve for
vacuuming. Vacuuming can not be executed completely
using such port.

Position of service port:

RZQ100~140B
Outdoor units have 2 ports on the piping. One
between the liquid receiver and the electronic
expansion valve and another one between the
heat exchanger and the 4-way valve.

RZQ71~140D
Outdoor units have 1 port on the piping. It is
between the heat exchanger and the 4-way valve.

Systems with sized-up liquid pipe

Replace 30 m by 15 m in calculations above and use
the table below.

G1: total length of Ø12.7 mm liquid piping.

Length exceeding 

"Chargeless length"

Model

Liquid 
piping

Ø

0~5 m

5~10 m

10~15 m

15~20 m

RZQ71

Main

12.7

0.5

1.0

RZQ100~140

Main

1.5

2.0

RZQ71

Branch

6.4

0.3

0.6

RZQ100~140

Branch

9.5

0.5

1.0

Refrigerant piping length

Model

Liquid pipe 

size

3~5

(a)

 m

5~10 m

10~20 m

20~30 m

30~40 m

40~50 m

50~60 m

60~75 m

RZQ100~140B

size-down

3.30 3.30

standard

3.30 3.30 3.80 4.30 4.80 5.30 5.80 6.30

RZQ71D

size-down

1.75 1.75

standard

1.75 1.75 2.25 2.75 3.25 3.75

RZQ100~140D

size-down

2.95 2.95

standard

2.95 2.95 3.45 3.95 4.45 4.95 5.45 5.95

Refrigerant piping length

Model

Liquid pipe 

size

3~5

(a)

 m

(a) When piping length is less than 5 m, a complete recharging of the unit is required. 

Charge the unit with the refrigerant charge as indicated.

5~10 m

10~15 m

15~20 m

20~25 m

25~30 m

30~35 m

RZQ100~140B

size-up

3.80

3.80

4.30

4.80

5.30

5.80

6.30

RZQ71D

2.25

2.25

2.75

3.25

3.75

RZQ100~140D

3.45

3.45

3.95

4.45

4.95

5.45

5.95

Never short-circuit the low pressure switch or low pressure
sensor during pump-down operation.

Procedure

Precaution

1

Make sure that stop valves 
both on liquid and on gas side 
are open.

2

Push the BS1 pumping-down 
operation button on the PC 
board of the outdoor unit. 

Compressor and outdoor fan 
will start operation 
automatically.
The indoor unit fan may 
automatically start running.
Please pay attention to this.

3

Once compressor operation 
stops after 3 or 5 minutes

(a)

close the stop valve on the 
liquid side and gas side 
securely. (See 

"How to use 

the stop valve" on page 8

)

Never leave the outdoor unit 
unattended with opened front 
panel when power supply is 
on.

4

Turn off the power supply.

Procedure

Precaution

1

Make sure that stop valves 
both on liquid and on gas side 
are open.

2

Push the BS4 pumping-down 
operation button on the PC 
board of the outdoor unit 
(±8 seconds).

Compressor and outdoor fan 
will start operation 
automatically.
The indoor unit fan may 
automatically start running.
Please pay attention to this.

3

Close the stop valve on the 
liquid side securely about 2 
minutes after the compressor 
started operation. (See 

"How 

to use the stop valve" on 
page 8

)

Never leave the outdoor unit 
unattended with opened front 
panel when power supply is 
on.
In case the stop valve on the 
liquid side is not securely 
closed during compressor 
operation, pumping-down 
operation cannot be executed.

4

Once compressor operation 
stops after 2 to 5 minutes

(a)

close the stop valve on the 
gas side securely. (See 

"How 

to use the stop valve" on 
page 8

)

5

Turn off the power supply.

Summary of Contents for RZQ71D7V1B

Page 1: ...INSTALLATION MANUAL RZQ71D7V1B RZQ71D2V1B RZQ100D7V1B RZQ125D7V1B RZQ140D7V1B RZQ100B8W1B RZQ125B8W1B RZQ140B8W1B Split System air conditioners...

Page 2: ...5 9 7 6 6 8 3 3 1 3 2 4 5 A B A E B C D H H1 L1 H1 H2 L3 L1 L2 H1 H2 L4 L1 L3 L2 H1 H2 L7 L1 L6 L5 L4 L3 L2 A A B2 B2 B2 C C D1 D1 D1 D2 D2 D2 D2 D2 E E H H L1 L1 L1 L2 L2 L2 A A B1 B1 B1 B1 B1 B1 B2...

Page 3: ...bestemmelsene i 13 noudattaen m r yksi 14 za dodr en ustanoven p edpisu 15 prema odredbama 16 k veti a z 17 zgodnie z postanowieniami Dyrektyw 18 n urma prevederilor 19 ob upo tevanju dolo b 20 vasta...

Page 4: ...ns or earthquakes Improper installation work may result in accidents due to fall of equipment Make certain that all electrical work is carried out by qualified personnel according to the local laws an...

Page 5: ...salt such as that near the ocean Where voltage fluctuates a lot such as that in factories In vehicles or vessels Where acidic or alkaline vapour is present Provide a logbook In accordance with the re...

Page 6: ...wind blows continuously on the face of the unit the fan can start rotating very fast until it breaks Refer to the figures for installation of this unit in a place where the wind direction can be fores...

Page 7: ...water may splash on people provide the drain piping using a drain socket optional Make sure the drain works properly INSTALLATION SERVICING SPACE The numerical figures used in here represent the dime...

Page 8: ...and international codes In Europe EN378 is the applicable standard that shall be used To persons in charge of piping work Be sure to open the stop valve after piping installing and vacuming is comple...

Page 9: ...te the room thoroughly right away Use R410A only when adding refrigerant Installation tools Make sure to use installation tools gauge manifold charge hose etc that are exclusively used for R410A insta...

Page 10: ...e effects If the indoor or outdoor units were disconnected from the piping for a long period of time water or dirt might have gotten into the piping If copper piping is corroded Flares should not be r...

Page 11: ...ions when connecting field piping and regarding insulation Be careful not to let the indoor and outdoor branch piping come into contact with the compressor terminal cover If the liquid side piping ins...

Page 12: ...y closed before leak test or vacuuming Set up for vacuuming and leak test see figure 8 Procedure for leak test Leak test must satisfy EN378 2 1 Evacuate the pipes and check vacuum 1 No pressure increa...

Page 13: ...amount is R1 R2 1 G1 total length of 9 5 mm liquid piping G2 total length of 6 4 mm liquid piping 2 a G1 30 m calculate length over 30 m G1 30 m Based on this length decide R1 R2 in the table b G1 30...

Page 14: ...ove and use the table below G1 total length of 12 7 mm liquid piping Length exceeding Chargeless length Model Liquid piping 0 5 m 5 10 m 10 15 m 15 20 m RZQ71 Main 12 7 0 5 1 0 RZQ100 140 Main 1 5 2 0...

Page 15: ...apacitor abnormal heating accident due to high frequency waves Therefore never install a phase advancing capacitor Secure the wiring in the order shown below 1 Secure the ground wire to the stop valve...

Page 16: ...e maximum values see electrical data of combination with indoor units for exact values 18 9 27 6 28 8 17 1 18 3 Recommended field fuse A 20 32 20 Wire type b b Only in protected pipes use H07RN F when...

Page 17: ...it decoration panel with infra red receiver first 5 In case the panels of indoor units are not yet installed to the indoor units make sure to shut off the power supply after finishing the complete tes...

Page 18: ...charge for V1 models only R3T Thermistor discharge pipe for W1 models only R3T Thermistor suction pipe for V1 models only R4T Thermistor suction pipe for W1 models only R4T Thermistor coil for V1 mode...

Page 19: ...NOTES NOTES...

Page 20: ...4PW48323 1B Copyright Daikin...

Reviews: