background image

Installation manual

3

RR+RQ71+10 RR+RQ71~125B7W1B

Split System air conditioners

4PW19370-1C

S

ELECTING

 

INSTALLATION

 

SITE

 

1

Select an installation site where the following conditions are
satisfied and that meets with your customer's approval.

-

Places which are well-ventilated.

-

Places where the unit does not bother next-door neighbours.

-

Safe places which can withstand the unit's weight and 
vibration and where the unit can be installed level.

-

Places where there is no possibility of flammable gas or 
product leak.

-

Places where servicing space can be well ensured.

-

Places where the indoor and outdoor units' piping and wiring 
lengths come within the allowable ranges.

-

Places where water leaking from the unit cannot cause 
damage to the location (e.g. in case of a blocked drain pipe).

-

Places where rain can be avoided as much as possible.

2

When installing the unit in a place exposed to strong wind, pay
special attention to the following.

Strong winds of 5 m/sec or more blowing against the outdoor
unit's air outlet causes short circuit (suction of discharge air),
and this may have the following consequences:
-

Deterioration of the operational capacity.

-

Frequent frost acceleration in heating operation.

-

Disruption of operation due to rise of high pressure.

-

When a strong wind blows continuously on the face of the 
unit, the fan can start rotating very fast until it breaks.

Refer to the figures for installation of this unit in a place where
the wind direction can be foreseen.

Turn  the air outlet side toward the building's wall, fence or
screen.

Set the outlet side at a right angle to the direction of the wind.

3

Prepare a water drainage channel around the foundation, to
drain waste water from around the unit.

4

If the water drainage of the unit is not easy, please build up the
unit on a foundation of concrete blocks, etc. (the height of the
foundation should be maximum 150 mm).

5

If you install the unit on a frame, please install a waterproof plate
within 150 mm of the underside of the unit in order to prevent the
invasion of water from the lower direction.

6

When installing the unit in a place frequently exposed to snow,
pay special attention to the following:

-

Elevate the foundation as high as possible.

-

Remove the rear suction grille to prevent snow from 
accumulating on the rear fins.

7

If you install the unit on a building frame,
please install a waterproof plate (within
150 mm of the underside of the unit) or
use a drain plug kit (option) in order to
avoid the drainwater dripping.

P

RECAUTIONS

 

ON

 

INSTALLATION

Check the strength and level of the installation ground so that
the unit will not cause any operating vibration or noise after
installation.

In accordance with the foundation drawing in the figure, fix the
unit securely by means of the foundation bolts. (Prepare four
sets of M12 foundation bolts, nuts and washers each which are
available on the market.)

It is best to screw in the foundation bolts until their length is
20 mm from the foundation surface.

Installation method for prevention of falling over

If it is necessary to prevent the unit from falling over, install as shown
in the figure.

prepare all 4 wires as indicated in the drawing

unscrew the top plate at the 4 locations indicated A and B

put the screws through the nooses and screw them back tight

A

location of the 2 fixation holes on the front side of the unit

B

location of the 2 fixation holes on the rear side of the unit

C

wires: field supply

Drain pipe disposal

If drain pipe disposal from the outdoor unit causes trouble, provide
the drain piping by using the drain socket (optional).

Strong wind

Blown air

Strong wind

Make sure there is enough room to do the installation

Discharge side

Bottom view (mm)

Drain hole

20

140

117

219

289

350

(345-355)

47

140

620

614

423

A

B

C

C

B

A

A

Summary of Contents for RQ100B7V3B

Page 1: ...INSTALLATION MANUAL RR71B7V3B RR100B7V3B RR71B7W1B RR100B7W1B RR125B7W1B RQ71B7V3B RQ100B7V3B RQ71B7W1B RQ100B7W1B RQ125B7W1B Split System air conditioners...

Page 2: ...1 1 2 4 5 2 4 5 9 7 6 6 8 3 3 1 3 2 4 5 A B A E B C D H H1 L1 H1 H2 L3 L1 L2 H1 H2 L4 L1 L3 L2 A A B2 B2 B2 C C D1 D1 D1 D2 D2 D2 D2 D2 E E H H L1 L1 L1 L2 L2 L2 A A B1 B1 B1 B1 B1 B1 B2 B2 B2 C C D1...

Page 3: ...zate n conformitate cu instruc iunile noastre 19 skladni z naslednjimi standardi in drugimi normativi pod pogojem da se uporabljajo v skladu z na imi navodili 20 on vastavuses j rgmis t e standardi te...

Page 4: ...m not exceeding the limit please consult with your distributor If the leaked amount exceeds the limit it may cause an oxygen deficiency accident Be sure to use only the specified accessories and parts...

Page 5: ...ning conductor or telephone earth wire Incomplete grounding may cause electric shocks Gas pipe Ignition or explosion may occur if the gas leaks Water pipe Hard vinyl tubes are not effective grounds Li...

Page 6: ...a foundation of concrete blocks etc the height of the foundation should be maximum 150 mm 5 If you install the unit on a frame please install a waterproof plate within 150 mm of the underside of the...

Page 7: ...omply with relevant local and national regulations The minimal pipe thickness for R 410A piping must be in accordance with the table below O Annealed 1 2H Half hard Suction side obstacle Obstacle is p...

Page 8: ...g cure the piping with a pinch or taping Great caution is needed when passing copper tubes through walls In case of simultanious operating system Upward and downward piping should be performed at the...

Page 9: ...only a torque wrench is used when loosening or tightening flare nuts always lock the shut off valve with a wrench and then use a torque wrench Do not place wrenches on the valve cover Do not apply fo...

Page 10: ...e and outside and first screw the nut 3 or 4 turns by hand Coat here with ether or ester oil After completing the installation carry out a gas leak inspection of the piping connections with nitrogen a...

Page 11: ...t 4 Weighing machine 5 Vacuum pump 6 Stop valve 7 Main pipe 8 Branched pipes 9 Pipe branching kit optional 1 Evacuate the pipes and check vacuum 1 No pressure increase for 1 minute 1 Use a 2 stage vac...

Page 12: ...uming can not be executed completely using such port Position of service port Heat pump Heat pump units have 2 ports on the piping One between the liquid receiver and the electronic expansion valve an...

Page 13: ...cover securely 1 Switch box 2 Stop valve mounting plate 3 Ground 4 Power supply and ground wiring 5 Wiring between units 6 Tie wrap When cables are routed from the unit a protection sleeve for the co...

Page 14: ...appens turn off the power re check the wiring and switch the position of two of the three electrical wires If operation is not possible do not under any circumstances force the electromagnetic contact...

Page 15: ...circuit R1T Thermistor air R2T Thermistor coil R3T Thermistor discharge RC Signal receiver circuit S1PH Pressure switch HIGH S1PL Pressure switch LOW SD Safety devices input T1A Transformer 220 240 V...

Page 16: ...Zandvoordestraat 300 B 8400 Oostende Belgium 4PWEN19370 1C...

Reviews: