background image

Installation manual

9

RR+RQ71+10 RR+RQ71~125B7W1B

Split System air conditioners

4PW19370-1C

Example 1

1

G1=L1+L2=35+7=42 m

G2=L3=5

2

Over 

30 

 m

a

G1

30=12 m

  Ø9.5 R1=1.00 kg

b

G2=5 m 

  Ø6.4 R2=0.30 kg

3

Refrigerant charge amount=R=R1+R2=1.00+0.30=1.30 kg

Example 2

1

G1=L1=5 m

G2=L2+L3+L4=17+17+20=54

2

Over 

30 

m

a

G1=5 m

 R1=0.0 kg

b

(G1+G2)

30=(5+54)

30=29

 Ø6.4 R2=0.90 kg

3

Refrigerant charge amount=R=R1+R2=0.0+0.9=0.9 kg

Total charging weight of the refrigerant (after a leak, 
etc.)

When the entire refrigerant pipe length is within 30 meters, charge
the refrigerant in accordance with the amount mentioned in the
nameplate, and when the pipe length exceeds 30 meters, the
charging amount mentioned in the nameplate and that required for
additional charging are to be totalled as the net charging amount.

Precaution for pumping-down operation

The outdoor unit is equipped with a low-pressure switch to protect the
compressor. 

Take the following steps to perform the pumping-down operation.

This is the end of pumping-down operation. After pumping-down
operation, the remote controller can show the following:

-

"U4"

-

blank screen

-

indoor fan operates for about 30 seconds

Even when the ON button on the remote controller is pressed, it will
not operate. Turn off the main power supply switch and turn it on
again in need of operation.

E

LECTRICAL

 

WIRING

 

WORK

L2=7 (Ø9.5)

71 type

100 type

L1=35 (Ø9.5)

indoor

L3=5 (Ø6.4)

35 type

outdoor heat pump

L2=17 (Ø6.4)

50 type

indoor

125 type

L1=5 (Ø9.5)

L3=17 (Ø6.4)

50 type

outdoor heat pump

indoor

L4=20 (Ø6.4)

50 type

NOTE

In case of complete recharge of the refrigerant, please first
execute vacuuming. Execute this vacuuming from the
service port. Do not use the port of the stop valve for
vacuuming. Vacuuming can not be executed completely
using such port.

Position of service port:

Heat pump: Heat pump units have 2 ports on the
piping. One between the liquid receiver and the
electronic expansion valve and another one between
the heat exchanger and the 4-way valve.
Cooling only: On the discharge pipe

NOTE

Never short-circuit the low pressure switch in this
operation.

Procedure

Precaution

1

Put a pressure gauge at the 
service port of the gas stop 
valve.

Use a pressure gauge 
reserved for R-410A 
exclusively.

2

Start the fan operation with the 
remote controller.

Confirm that stop valves both 
on the liquid and gas side are 
open.

3

Push the pumping-down 
button on the PC board of the 
outdoor unit.

Compressor and outdoor fan 
will start operation 
automatically.
If step 3 is performed before 
step 2, then the indoor fan 
may automatically start 
running. Please pay attention 
to this.

4

Continue operation for 
2 minutes until operation 
condition stabilizes.

5

Close the stop valve on the 
liquid side securely. (See 

"How 

to use the shut-off valve" on 
page 6

)

Insecure closing of the valve 
may result in burning of the 
compressor.

6

When the low-pressure switch 
is activated, the unit stops 
working. At this time, close the 
stop valve on the gas side.

All wiring must be performed by an authorized
electrician.

All components procured on the site and all electric
construction should comply with the applicable local
and national codes.

High voltage
To avoid electrical shock, make sure to disconnect the
power supply 1 minute or more before servicing the
electrical parts. Even after 1 minute, always measure
the voltage at the terminals of main circuit capacitors
or electrical parts and, before touching, make sure
that those voltages are 50 V DC or less.

NOTE

To persons in charge of electrical wiring work:

Do not operate the unit until the refrigerant piping is
complete. (Running it before the piping is ready will break
the compressor.)

Summary of Contents for RQ100B7V3B

Page 1: ...INSTALLATION MANUAL RR71B7V3B RR100B7V3B RR71B7W1B RR100B7W1B RR125B7W1B RQ71B7V3B RQ100B7V3B RQ71B7W1B RQ100B7W1B RQ125B7W1B Split System air conditioners...

Page 2: ...1 1 2 4 5 2 4 5 9 7 6 6 8 3 3 1 3 2 4 5 A B A E B C D H H1 L1 H1 H2 L3 L1 L2 H1 H2 L4 L1 L3 L2 A A B2 B2 B2 C C D1 D1 D1 D2 D2 D2 D2 D2 E E H H L1 L1 L1 L2 L2 L2 A A B1 B1 B1 B1 B1 B1 B2 B2 B2 C C D1...

Page 3: ...zate n conformitate cu instruc iunile noastre 19 skladni z naslednjimi standardi in drugimi normativi pod pogojem da se uporabljajo v skladu z na imi navodili 20 on vastavuses j rgmis t e standardi te...

Page 4: ...m not exceeding the limit please consult with your distributor If the leaked amount exceeds the limit it may cause an oxygen deficiency accident Be sure to use only the specified accessories and parts...

Page 5: ...ning conductor or telephone earth wire Incomplete grounding may cause electric shocks Gas pipe Ignition or explosion may occur if the gas leaks Water pipe Hard vinyl tubes are not effective grounds Li...

Page 6: ...a foundation of concrete blocks etc the height of the foundation should be maximum 150 mm 5 If you install the unit on a frame please install a waterproof plate within 150 mm of the underside of the...

Page 7: ...omply with relevant local and national regulations The minimal pipe thickness for R 410A piping must be in accordance with the table below O Annealed 1 2H Half hard Suction side obstacle Obstacle is p...

Page 8: ...g cure the piping with a pinch or taping Great caution is needed when passing copper tubes through walls In case of simultanious operating system Upward and downward piping should be performed at the...

Page 9: ...only a torque wrench is used when loosening or tightening flare nuts always lock the shut off valve with a wrench and then use a torque wrench Do not place wrenches on the valve cover Do not apply fo...

Page 10: ...e and outside and first screw the nut 3 or 4 turns by hand Coat here with ether or ester oil After completing the installation carry out a gas leak inspection of the piping connections with nitrogen a...

Page 11: ...t 4 Weighing machine 5 Vacuum pump 6 Stop valve 7 Main pipe 8 Branched pipes 9 Pipe branching kit optional 1 Evacuate the pipes and check vacuum 1 No pressure increase for 1 minute 1 Use a 2 stage vac...

Page 12: ...uming can not be executed completely using such port Position of service port Heat pump Heat pump units have 2 ports on the piping One between the liquid receiver and the electronic expansion valve an...

Page 13: ...cover securely 1 Switch box 2 Stop valve mounting plate 3 Ground 4 Power supply and ground wiring 5 Wiring between units 6 Tie wrap When cables are routed from the unit a protection sleeve for the co...

Page 14: ...appens turn off the power re check the wiring and switch the position of two of the three electrical wires If operation is not possible do not under any circumstances force the electromagnetic contact...

Page 15: ...circuit R1T Thermistor air R2T Thermistor coil R3T Thermistor discharge RC Signal receiver circuit S1PH Pressure switch HIGH S1PL Pressure switch LOW SD Safety devices input T1A Transformer 220 240 V...

Page 16: ...Zandvoordestraat 300 B 8400 Oostende Belgium 4PWEN19370 1C...