EDUS39-600-F5
Installation
FXHQ-M
27
•
Attach the plastic bushing (10) for remote controller
w
iring.
•
Insert the conduit for po
w
er supply
w
ire in the conduit hole,
and fix it
w
ith the lock nut.
• Power supply wire
Holding the control box lid, loosen the 2 securing scre
w
s,
remove the control box lid, match up the phases on the
po
w
er supply terminal block inside (2P), and make the con-
nections.
After this is done, use the attached clamp (4) to bind
w
ire
bet
w
een units to the anchor point.
(Refer to Fig. 28)
• Remote controller wire and transmission wire
Holding the control box lid, loosen the 2 securing scre
w
s,
remove the control box lid.
Thread the remote controller
w
ire and transmission
w
ire
through the conduit (11), secure
w
ith the clamp (4), and cut
off conduit (11) to suitable length. The conduit (11) can let
the
w
ire pass to a maximum of 2
w
ires. If there are three
or more
w
ires, use another conduit (11). Pull the
w
ires
inside through plastic bushing and connect the
w
ires to the
transmission terminal block (6P inside the control box. After
connecting, use the clamp (4) to bind the remote controller
w
ire together
w
ith the transmission
w
ire to the anchor.
(Refer to Fig. 27, 28, 29)
• The conduit (11) allo
w
s the remote controller
w
ire and
transmission
w
ire pass to a maximum of 2
w
ires.
WARNING
•
N
ever connect po
w
er supply
w
iring to the terminal block for
remote controller
w
iring as this could damage the entire sys-
tem.
• Use only specified
w
ire and connect
w
ires to the terminal
tightly. Be careful
w
ires do not place external stress on ter-
minals. Keep
w
ires in neat order so as to not obstruct other
e
q
uipment. Make sure that the electric box lid fits tightly.
Incomplete connections could result in overheating and, in
w
orse cases, result in electric shock or fire.
Resin bush (10)
Lock nut
Conduit
Conduit hole
Fig. 26
L
1
POWER SUPPLY
L
2
po
w
er supply
Ho
w
to connect po
w
er supply
terminal block (2P)
Control box
Transmission
terminal block (6P)
Po
w
er supply
teminal block (2P)
Remote controller
w
ire
and transmission
w
ire
Refer to Fig. 28
Ground terminal
Po
w
er supply
w
ire
Gas pipe
Li
q
uid pipe
Drain pipe
Conduit
Corking or Putty
Resin bush (10)
Control box
lid secuing scre
w
(2 pcs.)
Control box lid
Insulating tube (11)
Clamp (4)
Fig. 27
Fastener
Clamp (4)
Clamp (4)
Ground
w
ire
After securing the
cramp material
to the bracket,
cut off any extra
material.
Remote controller
w
ire and
transmission
w
ire
Fastener
Po
w
er supply
w
ire
Fig. 28
P
1
P
2
F
1
F
2
T
1
T
2
REMOTE
C
N
TRL
FORCED
OFF
TRA
N
SMISSIO
N
WIRI
N
G
Clamp (4)
Remote controller
w
ire
Transmission
terminal block (6P)
Transmission
w
ire
Insulating
tube (11)
1 in.
Fig. 29
Summary of Contents for FXHQ-M
Page 1: ...AMERICAS EDUS 39 600 F5 FXHQ M Ceiling Suspended Type...
Page 5: ...Dimensions EDUS39 600 F5 4 FXHQ M 3 Dimensions FXHQ12MVJU 3D049330...
Page 6: ...EDUS39 600 F5 Dimensions FXHQ M 5 FXHQ24MVJU 3D049331...
Page 7: ...Dimensions EDUS39 600 F5 6 FXHQ M FXHQ36MVJU 3D049332...
Page 10: ...EDUS39 600 F5 Electric Characteristics FXHQ M 9 6 Electric Characteristics C 4D049333...