6 Commissioning

Installation and operation manual

10

FXFQ20~125BVEB

VRV system air conditioner

4P540926-1B – 2019.01

6

Commissioning

NOTICE

NEVER  operate  the  unit  without  thermistors  and/or
pressure  sensors/switches.  Burning  of  the  compressor
might result.

6.1

Checklist before commissioning

After the installation of the unit, first check the following items. Once
all  below  checks  are  fulfilled,  the  unit  MUST  be  closed,  ONLY  then
can the unit be powered up.

You  read  the  complete  installation  instructions,  as
described in the 

installer reference guide

.

The 

indoor units

 are properly mounted.

In case a wireless user interface is used: The 

indoor unit

decoration panel

 with infrared receiver is installed.

The 

outdoor unit

 is properly mounted.

There are NO 

missing phases

 or 

reversed phases

.

The  system  is  properly 

earthed

  and  the  earth  terminals

are tightened.

The 

fuses

  or  locally  installed  protection  devices  are

installed according to this document, and have NOT been
bypassed.

The 

power  supply  voltage

  matches  the  voltage  on  the

identification label of the unit.

There  are  NO 

loose  connections

  or  damaged  electrical

components in the switch box.

The 

insulation resistance

 of the compressor is OK.

There  are  NO 

damaged  components

  or 

squeezed

pipes

 on the inside of the indoor and outdoor units.

There are NO 

refrigerant leaks

.

The  correct  pipe  size  is  installed  and  the 

pipes

  are

properly insulated.

The 

stop valves

 (gas and liquid) on the outdoor unit are

fully open.

6.2

To perform a test run

This  task  is  only  applicable  when  using  the  BRC1E52  or  BRC1E53
user  interface.  When  using  any  other  user  interface,  see  the
installation manual or service manual of the user interface.

NOTICE

Do not interrupt the test run.

INFORMATION

Backlight.

  To  perform  an  ON/OFF  action  on  the  user

interface,  the  backlight  does  not  need  to  be  lit.  For  any
other  action,  it  needs  to  be  lit  first.  The  backlight  is  lit  for
±30 seconds when you press a button.

1

Perform introductory steps.

#

Action

1

Open the liquid stop valve (A) and gas stop valve (B)
by removing the stem cap and turning
counterclockwise with a hex wrench until it stops.

A

B

2

Close the service cover to prevent electric shocks.

3

Turn ON power for at least 6 hours before starting
operation to protect the compressor.

4

On the user interface, set the unit to cooling operation
mode.

2

Start the test run

#

Action

Result

1

Go to the home menu.

Cool

Set to

28

°C

2

Press at least 4 seconds.

The Service Settings menu
is displayed.

3

Select Test Operation.

Return

Setting

Service Settings                   1/3

Test Operation

Maintenance Contact

Field Settings

Demand

Min Setpoints Differential

Group Address

4

Press.

Test Operation is
displayed on the home
menu.

Cool

Return

Setting

Test Operation

5

Press within 10 seconds.

Test run starts.

3

Check operation for 3 minutes.

4

Check operation of the airflow direction.

#

Action

Result

1

Press.

Return 

Setting

Return

Setting

Air Volume/direction

Air Volume

Direction

Position 0

Low

2

Select Position 0.

Return 

Setting

Return

Setting

Air Volume/direction

Air Volume

Direction

Low

Position 0

3

Change the position.

If the airflow flap of the
indoor unit moves,
operation is OK.

If not, operation is not OK.

Summary of Contents for FXFQ20BVEB

Page 1: ...d operation manual VRV system air conditioner English Installation and operation manual VRV system air conditioner FXFQ20BVEB FXFQ25BVEB FXFQ32BVEB FXFQ40BVEB FXFQ50BVEB FXFQ63BVEB FXFQ80BVEB FXFQ100B...

Page 2: ...pogojem da se uporabljajo v skladu z na imi navodili on vastavuses j rgmis t e standardi te ga v i teiste normatiivsete dokumentidega kui neid kasutatakse vastavalt meie juhenditele atitinka emiau nur...

Page 3: ...n airflow 14 12 4 1 To start the active circulation airflow 14 13 Maintenance and service 14 13 1 Precautions for maintenance and service 14 13 2 Cleaning the air filter suction grille air outlet and...

Page 4: ...allation with standard decoration panel 256 mm In case of installation with design decoration panel 294 mm In case of installation with self cleaning decoration panel 263 mm In case of installation wi...

Page 5: ...a1 Nut field supply a2 Double nut field supply b Washer accessories c Hanger bracket attached to the unit Paper pattern for installation upper part of the packing Use the paper pattern to determine t...

Page 6: ...cessory b Drain hose accessory c Rising drain piping vinyl pipe of 25 mm nominal diameter and 32 mm outer diameter field supply d Hanging bars field supply Condensation Take measures against condensat...

Page 7: ...exposed to any substance which may corrode components containing refrigerant unless the components are constructed of materials that are inherently resistant to corrosion or are suitably protected aga...

Page 8: ...Be sure to keep the power line and transmission line apart from each other Transmission wiring and power supply wiring may cross but may NOT run parallel 1 Remove the service cover 2 User interface ca...

Page 9: ...t the air volume speed If you want Then1 Outdoor unit M C1 C2 During cooling operation LL2 12 22 6 01 Setup volume2 02 During heating operation LL2 12 22 3 01 Setup volume2 02 Setting Time to clean ai...

Page 10: ...m a test run This task is only applicable when using the BRC1E52 or BRC1E53 user interface When using any other user interface see the installation manual or service manual of the user interface NOTIC...

Page 11: ...here is a voltage imbalance There is a missing phase in case of three phase power supply units Note Operation will be impossible Turn OFF the power recheck the wiring and switch two of the three elect...

Page 12: ...ermostat S RH Humidity sensor S W SW Operation switch SA F1S Surge arrestor SR WLU Signal receiver SS Selector switch SHEET METAL Terminal strip fixed plate T R Transformer TC TRC Transmitter V R V Va...

Page 13: ...eezing of the outdoor unit s air cooled coil increases over time restricting the energy transfer to the outdoor unit s coil Heating capability decreases and the system needs to go into defrost operati...

Page 14: ...mation Configuration 3 Select Circulation airflow Return Setting Main Menu 1 2 Circulation Airflow Individual Air Direction Energy Saving Options Schedule Maintenance Information Configuration 4 Choos...

Page 15: ...quipment How to clean the air filter NOTICE Do NOT use water of 50 C or higher Possible consequence Discoloration and deformation 1 Open the suction grille Standard panel 1 Design panel 1 1 2 2 2 Remo...

Page 16: ...he atmosphere Refrigerant type R410A Global warming potential GWP value 2087 5 NOTICE Applicable legislation on fluorinated greenhouse gases requires that the refrigerant charge of the unit is indicat...

Page 17: ...4P540926 1B 2019 01 15 Disposal NOTICE Do NOT try to dismantle the system yourself dismantling of the system treatment of the refrigerant oil and other parts MUST comply with applicable legislation U...

Page 18: ......

Page 19: ......

Page 20: ...4P540926 1B 2019 01 Copyright 2018 Daikin...

Reviews: